IAC logo
IAC Assessment: AM0910
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0910
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2024
Principal Product Fabricated Steel Products
NAICS 332312 - Fabricated Structural Metal Manufacturing
SIC 3441 - Fabricated Structural Metal
Sales $100,000,000-$500,000,000
# of Employees 100
Plant Area (Sq.Ft.) 110,000
Annual Production 23,000 Tons
Production Hrs. Annual 4,896
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $56,598 1,420,960 kWh $0.04
Electricity Demand $57,429 5,798 kW-months/year $9.90
Electricity Fees $12,243 - $ -
TOTAL ENERGY COSTS $126,270
RECOMMENDED SAVINGS* $80,603 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$20,462
Cost:
$371,576
$20,462 568,384 - - - - - - - - $20,462
568,384
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
02: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$46,540
Cost:
$7,723
- - - - $9,308 - - - $37,232 - -
-
kWh
-
-
kW-months/year
$9,308
-
$
-
-
$
$37,232
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$6,300
Cost:
$13,285
- - $6,300 636 - - - - - - -
-
kWh
$6,300
636
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$3,477
Cost:
$2,200
$3,477 96,583 - - - - - - - - $3,477
96,583
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,527
Cost:
$40
$1,200 33,305 $1,327 134 - - - - - - $1,200
33,305
kWh
$1,327
134
kW-months/year
-
-
$
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,116
Cost:
$1,776
$511 14,197 $274 28 - - $331 - - - $511
14,197
kWh
$274
28
kW-months/year
-
-
$
$331
-
$
-
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$181
Cost:
$390
$108 3,006 $73 8 - - - - - - $108
3,006
kWh
$73
8
kW-months/year
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$80,603
Cost:
$396,990
$25,758 715,475 $7,974 805 $9,308 - $331 - $37,232 - $25,758
715,475
kWh
$7,974
805
kW-months/year
$9,308
-
$
$331
-
$
$37,232
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost One-time Revenue or Avoided Cost