IAC logo
IAC Assessment: AM0919
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0919
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2024
Principal Product School students
NAICS 611110 - Elementary and Secondary Schools
SIC 8211 - Elementary And Secondary Schools
Sales $1,000,000-$5,000,000
# of Employees 34
Plant Area (Sq.Ft.) 72,881
Annual Production 100 Units
Production Hrs. Annual 3,377
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $22,233 517,056 kWh $0.04
Electricity Demand $45,010 3,415 kW-months/year $13.18
Natural Gas $7,316 712 MMBtu $10.28
TOTAL ENERGY COSTS $74,559
RECOMMENDED SAVINGS* $36,062 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,964
Cost:
$20,366
$5,270 122,562 $5,694 432 - - $5,270
122,562
kWh
$5,694
432
kW-months/year
-
-
MMBtu
02: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$19,780
Cost:
$468,000
- - $19,780 434,330 - - -
-
kWh
$19,780
434,330
kW-months/year
-
-
MMBtu
03: 2.5123 REDUCE FLUID FLOW RATES Savings:
$1,498
Cost:
$3,000
$1,498 34,847 - - - - $1,498
34,847
kWh
-
-
kW-months/year
-
-
MMBtu
04: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$3,503
Cost:
$2,500
$2,301 53,519 - - $1,202 117 $2,301
53,519
kWh
-
-
kW-months/year
$1,202
117
MMBtu
05: 2.7264 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION Savings:
$317
Cost:
$1,000
$70 1,630 - - $247 24 $70
1,630
kWh
-
-
kW-months/year
$247
24
MMBtu
TOTAL RECOMMENDED Savings:
$36,062
Cost:
$494,866
$9,139 212,558 $25,474 434,762 $1,449 141 $9,139
212,558
kWh
$25,474
434,762
kW-months/year
$1,449
141
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas