IAC logo
IAC Assessment: AM0927
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0927
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2024
Principal Product fabricated steel storage tanks and oilfield equipment
NAICS 332312 - Fabricated Structural Metal Manufacturing
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $50,000,000-$100,000,000
# of Employees 180
Plant Area (Sq.Ft.) 1,900,000
Annual Production 750 Units
Production Hrs. Annual 2,530
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $56,500 1,023,000 kWh $0.06
Electricity Demand $66,200 6,600 kW-months/year $10.03
Electricity Fees $49,950 - $ -
Natural Gas $7,135 664 MMBtu $10.75
Other Energy $133,900 6,048 MMBtu $22.14
TOTAL ENERGY COSTS $313,685
RECOMMENDED SAVINGS* $99,527 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Energy Electricity Usage Electricity Demand Other Energy
$ kWh $ kW-months/year $ MMBtu
01: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$86,006
Cost:
$120,000
$(-25,894) (-470,800) $(-22,000) (-2,200) $133,900 6,048 $(-25,894)
(-470,800)
kWh
$(-22,000)
(-2,200)
kW-months/year
$133,900
6,048
MMBtu
02: 2.5194 REDESIGN PROCESS Savings:
$7,085
Cost:
$34,585
$3,805 69,175 $3,280 328 - - $3,805
69,175
kWh
$3,280
328
kW-months/year
-
-
MMBtu
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$5,300
Cost:
$8,620
- - $5,300 530 - - -
-
kWh
$5,300
530
kW-months/year
-
-
MMBtu
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$841
Cost:
$166
$377 6,854 $464 46 - - $377
6,854
kWh
$464
46
kW-months/year
-
-
MMBtu
05: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$295
Cost:
$166
$132 2,405 $163 16 - - $132
2,405
kWh
$163
16
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$99,527
Cost:
$163,537
$(-21,580) (-392,366) $(-12,793) (-1,280) $133,900 6,048 $(-21,580)
(-392,366)
kWh
$(-12,793)
(-1,280)
kW-months/year
$133,900
6,048
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Other Energy Electricity Usage Electricity Demand Other Energy