IAC Assessment: AM0947
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0947
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2025
Principal Product Electric Motors
NAICS 335312 - Motor and Generator Manufacturing
SIC 3621 - Motors And Generators
Sales <$500,000
# of Employees 235
Plant Area (Sq.Ft.) 420,000
Annual Production 350 Units
Production Hrs. Annual 2,084
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $813,428 14,281,034 kWh $0.06
Electricity Demand $271,226 62,182 kW-months/year $4.36
Electricity Fees $35,504 - $ -
Natural Gas $51,498 7,621 MMBtu $6.76
TOTAL ENERGY COSTS $1,171,656
RECOMMENDED SAVINGS* $259,136 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$130,091
Cost:
$15,000
- - - - $97,511 - - - $32,580 - -
-
kWh
-
-
kW-months/year
$97,511
-
$
-
-
MMBtu
$32,580
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$12,879
Cost:
$2,550
- - - - - - $12,879 1,908 - - -
-
kWh
-
-
kW-months/year
-
-
$
$12,879
1,908
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$30,166
Cost:
$1,100
$29,900 533,900 $266 61 - - - - - - $29,900
533,900
kWh
$266
61
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,720
Cost:
$9,710
$4,720 84,200 - - - - - - - - $4,720
84,200
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,140
Cost:
$61,488
$3,075 54,918 $1,723 395 - - - - $342 - $3,075
54,918
kWh
$1,723
395
kW-months/year
-
-
$
-
-
MMBtu
$342
-
$
06: 2.4234 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER Savings:
$1,748
Cost:
$2,063
$1,748 31,220 - - - - - - - - $1,748
31,220
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
07: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$74,392
Cost:
$829,317
$74,392 1,305,119 - - - - - - - - $74,392
1,305,119
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$259,136
Cost:
$921,228
$113,835 2,009,357 $1,989 456 $97,511 - $12,879 1,908 $32,922 - $113,835
2,009,357
kWh
$1,989
456
kW-months/year
$97,511
-
$
$12,879
1,908
MMBtu
$32,922
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost