IAC logo
IAC Assessment: AR0006
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0006
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1993
Principal Product Hardwood flooring
NAICS n/a
SIC 2426 - Hardwood Dimension & Flooring Mills
Sales $1,000,000-$5,000,000
# of Employees 53
Plant Area (Sq.Ft.) 112,000
Annual Production 2,500,000 Thousand Feet
Production Hrs. Annual 2,086
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $166,614 1,827,374 kWh $0.09
Wood $10,386 30,279 MMBtu $0.34
TOTAL ENERGY COSTS $177,000
RECOMMENDED SAVINGS* $126,684 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,104
#|Description Savings
Cost
Status Electricity Usage Wood Electricity Usage Wood
$ kWh $ MMBtu
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$6,097
Cost:
$6,300
$6,097 66,823 - - $6,097
66,823
kWh
-
-
MMBtu
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,349
Cost:
$408
$2,349 25,791 - - $2,349
25,791
kWh
-
-
MMBtu
03: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$4,257
Cost:
$700
- - $4,257 7,430 -
-
kWh
$4,257
7,430
MMBtu
04: 2.3322 USE EXISTING DAM TO GENERATE ELECTRICITY Savings:
$11,401
Cost:
$2,700
$11,726 132,181 $(-325) (-955) $11,726
132,181
kWh
$(-325)
(-955)
MMBtu
05: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$102,580
Cost:
$120,000
$102,580 1,156,213 - - $102,580
1,156,213
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$126,684
Cost:
$130,108
$122,752 1,381,008 $3,932 6,475 $122,752
1,381,008
kWh
$3,932
6,475
MMBtu
TOTAL IMPLEMENTED Savings:
$24,104
Cost:
$10,108
$20,172 224,795 $3,932 6,475 $20,172
224,795
kWh
$3,932
6,475
MMBtu