IAC logo
IAC Assessment: AR0038
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0038
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1994
Principal Product Electric Motors
NAICS n/a
SIC 3621 - Motors And Generators
Sales $50,000,000-$100,000,000
# of Employees 250
Plant Area (Sq.Ft.) 112,000
Annual Production 28,600 Pieces
Production Hrs. Annual 6,570
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $536,003 7,778,429 kWh $0.07
Natural Gas $19,835 4,783 MMBtu $4.15
TOTAL ENERGY COSTS $555,838
RECOMMENDED SAVINGS* $35,866 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,875
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes
$ kWh $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,079
Cost:
$300
$4,079 59,203 - - - - $4,079
59,203
kWh
-
-
MMBtu
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,118
Cost:
$200
$2,118 30,774 - - - - $2,118
30,774
kWh
-
-
MMBtu
-
-
$
03: 2.7245 USE DIRECT AIR SUPPLY TO EXHAUST HOODS Savings:
$4,094
Cost:
$2,000
$4,094 123,681 - - - - $4,094
123,681
kWh
-
-
MMBtu
-
-
$
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$4,584
Cost:
$220
$4,584 66,530 - - - - $4,584
66,530
kWh
-
-
MMBtu
-
-
$
05: 2.4134 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE Savings:
$20,991
Cost:
$30,000
$38,134 553,341 $(-12,143) (-2,926) $(-5,000) - $38,134
553,341
kWh
$(-12,143)
(-2,926)
MMBtu
$(-5,000)
-
$
TOTAL RECOMMENDED Savings:
$35,866
Cost:
$32,720
$53,009 833,529 $(-12,143) (-2,926) $(-5,000) - $53,009
833,529
kWh
$(-12,143)
(-2,926)
MMBtu
$(-5,000)
-
$
TOTAL IMPLEMENTED Savings:
$14,875
Cost:
$2,720
$14,875 280,188 - - - - $14,875
280,188
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes