IAC logo
IAC Assessment: AR0078
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0078
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1996
Principal Product Door Components
NAICS n/a
SIC 3446 - Architectural Metal Work
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 100,000
Annual Production 7,000,000 Pieces
Production Hrs. Annual 4,171
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $79,065 1,390,387 kWh $0.06
Electricity Demand $37,182 4,415 kW-months/year $8.42
Natural Gas $25,414 6,742 MMBtu $3.77
TOTAL ENERGY COSTS $150,229
RECOMMENDED SAVINGS* $11,831 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,623
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)
$ kWh $ kW-months/year $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,669
Cost:
$4,669
$4,016 50,117 $653 156 - - $4,016
50,117
kWh
$653
156
kW-months/year
-
-
lb
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,486
Cost:
$980
$1,292 16,120 $194 46 - - $1,292
16,120
kWh
$194
46
kW-months/year
-
-
lb
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,723
Cost:
$75
$719 21,688 $1,004 63 - - $719
21,688
kWh
$1,004
63
kW-months/year
-
-
lb
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,053
Cost:
$250
$438 13,189 $615 39 - - $438
13,189
kWh
$615
39
kW-months/year
-
-
lb
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$2,900
Cost:
-
- - - - $2,900 104,000 -
-
kWh
-
-
kW-months/year
$2,900
104,000
lb
TOTAL RECOMMENDED Savings:
$11,831
Cost:
$5,974
$6,465 101,114 $2,466 304 $2,900 104,000 $6,465
101,114
kWh
$2,466
304
kW-months/year
$2,900
104,000
lb
TOTAL IMPLEMENTED Savings:
$4,623
Cost:
$75
$719 21,688 $1,004 63 $2,900 104,000 $719
21,688
kWh
$1,004
63
kW-months/year
$2,900
104,000
lb
Savings
Cost
$ kWh $ kW-months/year $ lb
Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)