Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Arkansas |
---|---|
Assessment Year | 1996 |
Principal Product | Uniform Pants |
NAICS | n/a |
SIC | 2326 - Men's and Boys' Work Clothing |
Sales | $1,000,000-$5,000,000 |
# of Employees | 51 |
Plant Area (Sq.Ft.) | 30,000 |
Annual Production | 88,400 Pieces |
Production Hrs. Annual | 2,216 |
Location (State) | AR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $17,848 | 405,041 | kWh | $0.04 |
Electricity Demand | $11,643 | 1,250 | kW-months/year | $9.31 |
Natural Gas | $1,214 | 208 | MMBtu | $5.84 |
TOTAL ENERGY COSTS | $39,287 | |||
RECOMMENDED SAVINGS* | $10,116 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $7,947 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $5,549 Cost: $612 |
$2,989 | 66,530 | $2,560 | 283 | - | - |
$2,989 66,530 kWh |
$2,560 283 kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $992 Cost: $41 |
$548 | 12,309 | $444 | 49 | - | - |
$548 12,309 kWh |
$444 49 kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $498 Cost: $90 |
$238 | 5,569 | $260 | 29 | - | - |
$238 5,569 kWh |
$260 29 kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS |
Savings: $908 Cost: $400 |
$908 | 20,223 | - | - | - | - |
$908 20,223 kWh |
- - kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $202 Cost: $130 |
$97 | 2,052 | $105 | 12 | - | - |
$97 2,052 kWh |
$105 12 kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $1,967 Cost: $6,000 |
- | - | - | - | $1,967 | 33,600 |
- - kWh |
- - kW-months/year |
$1,967 33,600 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $10,116 Cost: $7,273 |
$4,780 | 106,683 | $3,369 | 373 | $1,967 | 33,600 | $4,780 106,683 kWh |
$3,369 373 kW-months/year |
$1,967 33,600 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $7,947 Cost: $1,143 |
$4,683 | 104,631 | $3,264 | 361 | - | - | $4,683 104,631 kWh |
$3,264 361 kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Solid Waste (non-haz) |