IAC logo
IAC Assessment: AR0100
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0100
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1996
Principal Product Uniform Pants
NAICS n/a
SIC 2326 - Men's and Boys' Work Clothing
Sales $1,000,000-$5,000,000
# of Employees 51
Plant Area (Sq.Ft.) 30,000
Annual Production 88,400 Pieces
Production Hrs. Annual 2,216
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $17,848 405,041 kWh $0.04
Electricity Demand $11,643 1,250 kW-months/year $9.31
Natural Gas $1,214 208 MMBtu $5.84
TOTAL ENERGY COSTS $39,287
RECOMMENDED SAVINGS* $10,116 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,947
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)
$ kWh $ kW-months/year $ lb
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$5,549
Cost:
$612
$2,989 66,530 $2,560 283 - - $2,989
66,530
kWh
$2,560
283
kW-months/year
-
-
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$992
Cost:
$41
$548 12,309 $444 49 - - $548
12,309
kWh
$444
49
kW-months/year
-
-
lb
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$498
Cost:
$90
$238 5,569 $260 29 - - $238
5,569
kWh
$260
29
kW-months/year
-
-
lb
04: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$908
Cost:
$400
$908 20,223 - - - - $908
20,223
kWh
-
-
kW-months/year
-
-
lb
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$202
Cost:
$130
$97 2,052 $105 12 - - $97
2,052
kWh
$105
12
kW-months/year
-
-
lb
06: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$1,967
Cost:
$6,000
- - - - $1,967 33,600 -
-
kWh
-
-
kW-months/year
$1,967
33,600
lb
TOTAL RECOMMENDED Savings:
$10,116
Cost:
$7,273
$4,780 106,683 $3,369 373 $1,967 33,600 $4,780
106,683
kWh
$3,369
373
kW-months/year
$1,967
33,600
lb
TOTAL IMPLEMENTED Savings:
$7,947
Cost:
$1,143
$4,683 104,631 $3,264 361 - - $4,683
104,631
kWh
$3,264
361
kW-months/year
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ lb
Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)