Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1996
Principal Product Framed Art, Accessories, and Lamps
NAICS n/a
SIC 2499 - Wood Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 90
Plant Area (Sq.Ft.) 104,000
Annual Production 40,000 Pieces
Production Hrs. Annual 2,998
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $77,786 977,726 kWh $0.08
Electricity Demand $15,904 4,203 kW-months/year $3.78
Natural Gas $4,833 994 MMBtu $4.86
TOTAL ENERGY COSTS $129,030
RECOMMENDED SAVINGS* $41,999 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $714
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz)
$ kWh $ kW-months/year $ gal $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$714
Cost:
$299
$595 7,327 $119 32 - - - - $595
7,327
kWh
$119
32
kW-months/year
-
-
gal
-
-
lb
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,338
Cost:
$440
$1,019 12,603 $319 84 - - - - $1,019
12,603
kWh
$319
84
kW-months/year
-
-
gal
-
-
lb
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$631
Cost:
$200
$503 6,741 $128 34 - - - - $503
6,741
kWh
$128
34
kW-months/year
-
-
gal
-
-
lb
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$333
Cost:
$70
$265 3,224 $68 18 - - - - $265
3,224
kWh
$68
18
kW-months/year
-
-
gal
-
-
lb
05: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$3,574
Cost:
$3,000
$3,574 44,549 - - - - - - $3,574
44,549
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
06: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$11,265
Cost:
$11,000
- - - - $11,265 2,079 - - -
-
kWh
-
-
kW-months/year
$11,265
2,079
gal
-
-
lb
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$24,144
Cost:
$1,000
- - - - - - $24,144 448,000 -
-
kWh
-
-
kW-months/year
-
-
gal
$24,144
448,000
lb
TOTAL RECOMMENDED Savings:
$41,999
Cost:
$16,009
$5,956 74,444 $634 168 $11,265 2,079 $24,144 448,000 $5,956
74,444
kWh
$634
168
kW-months/year
$11,265
2,079
gal
$24,144
448,000
lb
TOTAL IMPLEMENTED Savings:
$714
Cost:
$299
$595 7,327 $119 32 - - - - $595
7,327
kWh
$119
32
kW-months/year
-
-
gal
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ gal $ lb
Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz)