Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Arkansas |
---|---|
Assessment Year | 1997 |
Principal Product | Sawmill Machinery |
NAICS | n/a |
SIC | 3553 - Woodworking Machinery |
Sales | $10,000,000-$50,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 157,000 |
Annual Production | 650 Pieces |
Production Hrs. Annual | 5,344 |
Location (State) | AR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $66,710 | 1,946,659 | kWh | $0.03 |
Electricity Demand | $92,832 | 6,908 | kW-months/year | $13.44 |
Natural Gas | $15,755 | 3,543 | MMBtu | $4.45 |
TOTAL ENERGY COSTS | $240,979 | |||
RECOMMENDED SAVINGS* | $56,565 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $43,006 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,354 Cost: $240 |
$1,247 | 35,463 | $1,107 | 82 | - | - | - | - |
$1,247 35,463 kWh |
$1,107 82 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $3,078 Cost: $3,090 |
$1,370 | 40,445 | $1,708 | 127 | - | - | - | - |
$1,370 40,445 kWh |
$1,708 127 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $988 Cost: - |
$431 | 12,603 | $557 | 41 | - | - | - | - |
$431 12,603 kWh |
$557 41 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $693 Cost: $50 |
$329 | 9,672 | $364 | 27 | - | - | - | - |
$329 9,672 kWh |
$364 27 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $1,779 Cost: $330 |
$1,006 | 32,239 | $773 | 57 | - | - | - | - |
$1,006 32,239 kWh |
$773 57 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $6,121 Cost: $4,140 |
- | - | $6,121 | 440 | - | - | - | - |
- - kWh |
$6,121 440 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $29,674 Cost: $6,000 |
- | - | - | - | $29,674 | 756,000 | - | - |
- - kWh |
- - kW-months/year |
$29,674 756,000 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5213 REUSE SCRAP PRINTED PAPER FOR MAKE-READY |
Savings: $7,118 Cost: $300 |
- | - | - | - | $7,118 | 2,560 | - | - |
- - kWh |
- - kW-months/year |
$7,118 2,560 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.121 MAINTAIN CLEAN CONDITIONS BEFORE PAINTING |
Savings: $4,760 Cost: $2,500 |
- | - | - | - | - | - | $4,760 | - |
- - kWh |
- - kW-months/year |
- - lb |
$4,760 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $56,565 Cost: $16,650 |
$4,383 | 130,422 | $10,630 | 774 | $36,792 | 758,560 | $4,760 | - | $4,383 130,422 kWh |
$10,630 774 kW-months/year |
$36,792 758,560 lb |
$4,760 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $43,006 Cost: $13,800 |
$3,623 | 108,147 | $9,709 | 706 | $29,674 | 756,000 | - | - | $3,623 108,147 kWh |
$9,709 706 kW-months/year |
$29,674 756,000 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes |