IAC logo
IAC Assessment: AR0116
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0116
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1997
Principal Product Breading Batter
NAICS n/a
SIC 2099 - Food Preparations, Nec
Sales $50,000,000-$100,000,000
# of Employees 60
Plant Area (Sq.Ft.) 125,000
Annual Production 120,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $137,120 4,306,858 kWh $0.03
Electricity Demand $52,625 9,435 kW-months/year $5.58
Natural Gas $156,980 50,250 MMBtu $3.12
TOTAL ENERGY COSTS $459,728
RECOMMENDED SAVINGS* $46,953 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,373
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Primary Product
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,449
Cost:
$575
$1,100 34,291 $349 62 - - - - - - $1,100
34,291
kWh
$349
62
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,541
Cost:
$2,100
$1,207 37,808 $334 60 - - - - - - $1,207
37,808
kWh
$334
60
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,366
Cost:
$45
$1,987 62,134 $379 68 - - - - - - $1,987
62,134
kWh
$379
68
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$427
Cost:
$80
$345 10,844 $82 15 - - - - - - $345
10,844
kWh
$82
15
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$4,571
Cost:
$14,000
- - - - $4,571 1,465 - - - - -
-
kWh
-
-
kW-months/year
$4,571
1,465
MMBtu
-
-
lb
-
-
$
06: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$5,922
Cost:
-
- - - - - - $5,922 154,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,922
154,000
lb
-
-
$
07: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$544
Cost:
-
- - - - - - $544 154,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$544
154,000
lb
-
-
$
08: 4.4230 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$30,133
Cost:
$37,400
- - - - - - - - $30,133 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$30,133
-
$
TOTAL RECOMMENDED Savings:
$46,953
Cost:
$54,200
$4,639 145,077 $1,144 205 $4,571 1,465 $6,466 308,000 $30,133 - $4,639
145,077
kWh
$1,144
205
kW-months/year
$4,571
1,465
MMBtu
$6,466
308,000
lb
$30,133
-
$
TOTAL IMPLEMENTED Savings:
$10,373
Cost:
$2,145
$3,194 99,942 $713 128 - - $6,466 308,000 - - $3,194
99,942
kWh
$713
128
kW-months/year
-
-
MMBtu
$6,466
308,000
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Primary Product