Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Arkansas |
---|---|
Assessment Year | 1997 |
Principal Product | Infant, Youth and Adult Shoes |
NAICS | n/a |
SIC | 3149 - Footwear, Except Rubber, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 201 |
Plant Area (Sq.Ft.) | 74,000 |
Annual Production | 553,000 Pieces |
Production Hrs. Annual | 2,125 |
Location (State) | AR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $53,543 | 1,356,096 | kWh | $0.04 |
Electricity Demand | $27,667 | 7,262 | kW-months/year | $3.81 |
Natural Gas | $4,993 | 1,414 | MMBtu | $3.53 |
TOTAL ENERGY COSTS | $103,231 | |||
RECOMMENDED SAVINGS* | $58,325 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $10,547 |
#|Description |
Savings Cost |
Status | Electricity Usage | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Water Disposal | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | Tgal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $311 Cost: $231 |
$311 | 5,569 | - | - | - | - | - | - |
$311 5,569 kWh |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $395 Cost: $816 |
$395 | 6,741 | - | - | - | - | - | - |
$395 6,741 kWh |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $159 Cost: - |
$159 | 2,931 | - | - | - | - | - | - |
$159 2,931 kWh |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $89 Cost: $150 |
$89 | 1,465 | - | - | - | - | - | - |
$89 1,465 kWh |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $686 Cost: $60 |
$686 | 13,775 | - | - | - | - | - | - |
$686 13,775 kWh |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7314 REDUCE VENTILATION AIR |
Savings: $4,459 Cost: $12,500 |
$4,459 | 76,495 | - | - | - | - | - | - |
$4,459 76,495 kWh |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $320 Cost: $738 |
$320 | 7,327 | - | - | - | - | - | - |
$320 7,327 kWh |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.4115 RECOVER AND REUSE COOLING WATER |
Savings: $2,438 Cost: $4,200 |
- | - | $2,438 | 6,371 | - | - | - | - |
- - kWh |
$2,438 6,371 Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $2,410 Cost: - |
- | - | - | - | $2,410 | 70,000 | - | - |
- - kWh |
- - Tgal |
$2,410 70,000 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 4.442 INSTALL MAGAZINES FOR TEMPORARY STORAGE |
Savings: $16,725 Cost: $12,600 |
- | - | - | - | $4,725 | 3,443 | $12,000 | - |
- - kWh |
- - Tgal |
$4,725 3,443 lb |
$12,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS |
Savings: $30,333 Cost: $15,000 |
- | - | - | - | - | - | $30,333 | - |
- - kWh |
- - Tgal |
- - lb |
$30,333 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $58,325 Cost: $46,295 |
$6,419 | 114,303 | $2,438 | 6,371 | $7,135 | 73,443 | $42,333 | - | $6,419 114,303 kWh |
$2,438 6,371 Tgal |
$7,135 73,443 lb |
$42,333 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $10,547 Cost: $17,576 |
$5,699 | 99,942 | $2,438 | 6,371 | $2,410 | 70,000 | - | - | $5,699 99,942 kWh |
$2,438 6,371 Tgal |
$2,410 70,000 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | Tgal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Water Disposal | Solid Waste (non-haz) | Personnel Changes |