Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Arkansas |
---|---|
Assessment Year | 1997 |
Principal Product | Whole Fresh and Frozen Turkeys |
NAICS | n/a |
SIC | 2015 - Poultry Slaughtering And Processing |
Sales | $10,000,000-$50,000,000 |
# of Employees | 485 |
Plant Area (Sq.Ft.) | 116,000 |
Annual Production | 166,083,646 Pounds |
Production Hrs. Annual | 2,210 |
Location (State) | AR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $397,055 | 19,296,894 | kWh | $0.02 |
Electricity Demand | $186,425 | 43,516 | kW-months/year | $4.28 |
Natural Gas | $179,996 | 71,577 | MMBtu | $2.51 |
TOTAL ENERGY COSTS | $1,066,144 | |||
RECOMMENDED SAVINGS* | $285,517 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $6,945 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Other Gas | Water Disposal | Personnel Changes | Electricity Usage | Electricity Demand | Other Gas | Water Disposal | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $491 Cost: $180 |
$233 | 10,844 | $258 | 60 | - | - | - | - | - | - |
$233 10,844 kWh |
$258 60 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $130 Cost: $81 |
$93 | 4,396 | $37 | 9 | - | - | - | - | - | - |
$93 4,396 kWh |
$37 9 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,085 Cost: - |
$559 | 26,671 | $526 | 123 | - | - | - | - | - | - |
$559 26,671 kWh |
$526 123 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2425 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER |
Savings: $4,495 Cost: $16,000 |
- | - | - | - | $4,495 | 1,791 | - | - | - | - |
- - kWh |
- - kW-months/year |
$4,495 1,791 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.4115 RECOVER AND REUSE COOLING WATER |
Savings: $6,680 Cost: $9,800 |
- | - | - | - | - | - | $6,680 | 3,711,700 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$6,680 3,711,700 Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE |
Savings: $5,369 Cost: $200 |
$595 | 69,461 | - | - | - | - | $4,774 | 2,652,000 | - | - |
$595 69,461 kWh |
- - kW-months/year |
- - MMBtu |
$4,774 2,652,000 Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT |
Savings: $143,923 Cost: $406,000 |
$(-1,959) | (-49,531) | - | - | - | - | - | - | $145,882 | - |
$(-1,959) (-49,531) kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$145,882 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT |
Savings: $123,344 Cost: $597,000 |
$(-1,697) | (-42,790) | - | - | - | - | - | - | $125,041 | - |
$(-1,697) (-42,790) kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$125,041 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $285,517 Cost: $1,029,261 |
$(-2,176) | 19,051 | $821 | 192 | $4,495 | 1,791 | $11,454 | 6,363,700 | $270,923 | - | $(-2,176) 19,051 kWh |
$821 192 kW-months/year |
$4,495 1,791 MMBtu |
$11,454 6,363,700 Tgal |
$270,923 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $6,945 Cost: $380 |
$1,387 | 106,976 | $784 | 183 | - | - | $4,774 | 2,652,000 | - | - | $1,387 106,976 kWh |
$784 183 kW-months/year |
- - MMBtu |
$4,774 2,652,000 Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Other Gas | Water Disposal | Personnel Changes | Electricity Usage | Electricity Demand | Other Gas | Water Disposal | Personnel Changes |