IAC logo
IAC Assessment: AR0131
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0131
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1998
Principal Product Wood Pallets
NAICS n/a
SIC 2448 - Wood Pallets And Skids
Sales $5,000,000-$10,000,000
# of Employees 65
Plant Area (Sq.Ft.) 52,900
Annual Production 76,000,000 Pounds
Production Hrs. Annual 2,250
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $31,982 943,142 kWh $0.03
Electricity Demand $35,880 6,395 kW-months/year $5.61
TOTAL ENERGY COSTS $69,248
RECOMMENDED SAVINGS* $171,467 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $96,957
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,315
Cost:
$269
$760 22,274 $555 99 - - - - $760
22,274
kWh
$555
99
kW-months/year
-
-
lb
-
-
$
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,297
Cost:
-
$1,297 38,101 - - - - - - $1,297
38,101
kWh
-
-
kW-months/year
-
-
lb
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,920
Cost:
-
$1,078 31,653 $842 150 - - - - $1,078
31,653
kWh
$842
150
kW-months/year
-
-
lb
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$393
Cost:
$6,580
$222 6,448 $171 30 - - - - $222
6,448
kWh
$171
30
kW-months/year
-
-
lb
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$774
Cost:
$90
$412 12,309 $362 65 - - - - $412
12,309
kWh
$362
65
kW-months/year
-
-
lb
-
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$7,882
Cost:
$10,035
- - $7,882 - - - - - -
-
kWh
$7,882
-
kW-months/year
-
-
lb
-
-
$
07: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$23,082
Cost:
$44,000
$(-9,836) (-35,463) - - $32,918 5,356,800 - - $(-9,836)
(-35,463)
kWh
-
-
kW-months/year
$32,918
5,356,800
lb
-
-
$
08: 4.4420 INSTALL MAGAZINES FOR TEMPORARY STORAGE Savings:
$63,000
Cost:
$8,000
- - - - - - $63,000 - -
-
kWh
-
-
kW-months/year
-
-
lb
$63,000
-
$
09: 4.5130 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$71,804
Cost:
$19,800
$(-196) (-3,517) - - - - $72,000 - $(-196)
(-3,517)
kWh
-
-
kW-months/year
-
-
lb
$72,000
-
$
TOTAL RECOMMENDED Savings:
$171,467
Cost:
$88,774
$(-6,263) 71,805 $9,812 344 $32,918 5,356,800 $135,000 - $(-6,263)
71,805
kWh
$9,812
344
kW-months/year
$32,918
5,356,800
lb
$135,000
-
$
TOTAL IMPLEMENTED Savings:
$96,957
Cost:
$63,890
$(-8,323) 11,430 $362 65 $32,918 5,356,800 $72,000 - $(-8,323)
11,430
kWh
$362
65
kW-months/year
$32,918
5,356,800
lb
$72,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes