Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Arkansas |
---|---|
Assessment Year | 1998 |
Principal Product | Custom Store Display Fixtures |
NAICS | n/a |
SIC | 2541 - Wood Partitions And Fixtures |
Sales | $10,000,000-$50,000,000 |
# of Employees | 140 |
Plant Area (Sq.Ft.) | 137,167 |
Annual Production | 800 Pieces |
Production Hrs. Annual | 2,168 |
Location (State) | AR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $42,631 | 1,288,687 | kWh | $0.03 |
Electricity Demand | $25,732 | 4,078 | kW-months/year | $6.31 |
Natural Gas | $23,418 | 4,650 | MMBtu | $5.04 |
TOTAL ENERGY COSTS | $120,382 | |||
RECOMMENDED SAVINGS* | $80,380 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $3,511 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,006 Cost: $320 |
$975 | 29,601 | $1,031 | 163 | - | - | - | - | - | - |
$975 29,601 kWh |
$1,031 163 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $227 Cost: $150 |
$110 | 3,224 | $117 | 18 | - | - | - | - | - | - |
$110 3,224 kWh |
$117 18 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,278 Cost: - |
$621 | 18,757 | $657 | 104 | - | - | - | - | - | - |
$621 18,757 kWh |
$657 104 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $10,614 Cost: $8,000 |
$(-148) | (-1,758) | - | - | $12,721 | 408,000 | $(-1,959) | - | - | - |
$(-148) (-1,758) kWh |
- - kW-months/year |
$12,721 408,000 lb |
$(-1,959) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $7,249 Cost: $44,000 |
$(-3,043) | (-28,136) | - | - | $35,663 | 4,243,200 | $(-4,151) | - | $(-21,220) | - |
$(-3,043) (-28,136) kWh |
- - kW-months/year |
$35,663 4,243,200 lb |
$(-4,151) - $ |
$(-21,220) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $59,006 Cost: $40,400 |
$(-397) | (-6,448) | - | - | - | - | $59,403 | - | - | - |
$(-397) (-6,448) kWh |
- - kW-months/year |
- - lb |
$59,403 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $80,380 Cost: $92,870 |
$(-1,882) | 15,240 | $1,805 | 285 | $48,384 | 4,651,200 | $53,293 | - | $(-21,220) | - | $(-1,882) 15,240 kWh |
$1,805 285 kW-months/year |
$48,384 4,651,200 lb |
$53,293 - $ |
$(-21,220) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $3,511 Cost: $470 |
$1,706 | 51,582 | $1,805 | 285 | - | - | - | - | - | - | $1,706 51,582 kWh |
$1,805 285 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost |