IAC logo
IAC Assessment: AR0132
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0132
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1998
Principal Product Custom Store Display Fixtures
NAICS n/a
SIC 2541 - Wood Partitions And Fixtures
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 137,167
Annual Production 800 Pieces
Production Hrs. Annual 2,168
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $42,631 1,288,687 kWh $0.03
Electricity Demand $25,732 4,078 kW-months/year $6.31
Natural Gas $23,418 4,650 MMBtu $5.04
TOTAL ENERGY COSTS $120,382
RECOMMENDED SAVINGS* $80,380 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,511
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ lb $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,006
Cost:
$320
$975 29,601 $1,031 163 - - - - - - $975
29,601
kWh
$1,031
163
kW-months/year
-
-
lb
-
-
$
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$227
Cost:
$150
$110 3,224 $117 18 - - - - - - $110
3,224
kWh
$117
18
kW-months/year
-
-
lb
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,278
Cost:
-
$621 18,757 $657 104 - - - - - - $621
18,757
kWh
$657
104
kW-months/year
-
-
lb
-
-
$
-
-
$
04: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$10,614
Cost:
$8,000
$(-148) (-1,758) - - $12,721 408,000 $(-1,959) - - - $(-148)
(-1,758)
kWh
-
-
kW-months/year
$12,721
408,000
lb
$(-1,959)
-
$
-
-
$
05: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$7,249
Cost:
$44,000
$(-3,043) (-28,136) - - $35,663 4,243,200 $(-4,151) - $(-21,220) - $(-3,043)
(-28,136)
kWh
-
-
kW-months/year
$35,663
4,243,200
lb
$(-4,151)
-
$
$(-21,220)
-
$
06: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$59,006
Cost:
$40,400
$(-397) (-6,448) - - - - $59,403 - - - $(-397)
(-6,448)
kWh
-
-
kW-months/year
-
-
lb
$59,403
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$80,380
Cost:
$92,870
$(-1,882) 15,240 $1,805 285 $48,384 4,651,200 $53,293 - $(-21,220) - $(-1,882)
15,240
kWh
$1,805
285
kW-months/year
$48,384
4,651,200
lb
$53,293
-
$
$(-21,220)
-
$
TOTAL IMPLEMENTED Savings:
$3,511
Cost:
$470
$1,706 51,582 $1,805 285 - - - - - - $1,706
51,582
kWh
$1,805
285
kW-months/year
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost