IAC logo
IAC Assessment: AR0138
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0138
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1998
Principal Product Pumps
NAICS n/a
SIC 3561 - Pumps And Pumping Equipment
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 102,000
Annual Production 120,000 Pieces
Production Hrs. Annual 6,240
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $109,211 3,343,787 kWh $0.03
Electricity Demand $56,984 8,442 kW-months/year $6.75
Natural Gas $3,265 511 MMBtu $6.39
TOTAL ENERGY COSTS $194,526
RECOMMENDED SAVINGS* $29,413 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,679
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ gal $ lb $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,160
Cost:
$120
$4,421 133,939 $1,739 258 - - - - - - $4,421
133,939
kWh
$1,739
258
kW-months/year
-
-
gal
-
-
lb
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$798
Cost:
$110
$573 17,292 $225 33 - - - - - - $573
17,292
kWh
$225
33
kW-months/year
-
-
gal
-
-
lb
-
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$465
Cost:
$120
$329 9,965 $136 20 - - - - - - $329
9,965
kWh
$136
20
kW-months/year
-
-
gal
-
-
lb
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$367
Cost:
$615
$251 7,620 $116 17 - - - - - - $251
7,620
kWh
$116
17
kW-months/year
-
-
gal
-
-
lb
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$6,014
Cost:
$998
$6,014 182,298 - - - - - - - - $6,014
182,298
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,276
Cost:
$182
$1,276 38,687 - - - - - - - - $1,276
38,687
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
-
-
$
07: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$5,107
Cost:
$8,000
- - $(-114) (-14) - - $5,628 84,000 $(-407) - -
-
kWh
$(-114)
(-14)
kW-months/year
-
-
gal
$5,628
84,000
lb
$(-407)
-
$
08: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$5,864
Cost:
$5,900
$(-154) (-4,689) $(-243) (-36) $6,732 2,376 - - $(-471) - $(-154)
(-4,689)
kWh
$(-243)
(-36)
kW-months/year
$6,732
2,376
gal
-
-
lb
$(-471)
-
$
09: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$2,411
Cost:
$1,595
- - - - - - - - $2,411 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
$2,411
-
$
10: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$951
Cost:
$2,000
- - - - - - - - $951 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
$951
-
$
TOTAL RECOMMENDED Savings:
$29,413
Cost:
$19,640
$12,710 385,112 $1,859 278 $6,732 2,376 $5,628 84,000 $2,484 - $12,710
385,112
kWh
$1,859
278
kW-months/year
$6,732
2,376
gal
$5,628
84,000
lb
$2,484
-
$
TOTAL IMPLEMENTED Savings:
$10,679
Cost:
$2,632
$6,277 190,211 $1,991 295 - - - - $2,411 - $6,277
190,211
kWh
$1,991
295
kW-months/year
-
-
gal
-
-
lb
$2,411
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ lb $ $
Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Personnel Changes