Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Arkansas |
---|---|
Assessment Year | 1998 |
Principal Product | Hoist and Related Equipment |
NAICS | n/a |
SIC | 3536 - Hoists, Cranes, And Monorails |
Sales | $50,000,000-$100,000,000 |
# of Employees | 315 |
Plant Area (Sq.Ft.) | 225,000 |
Annual Production | 11,000 Pieces |
Production Hrs. Annual | 4,000 |
Location (State) | AR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $229,428 | 7,076,202 | kWh | $0.03 |
Electricity Demand | $227,699 | 17,114 | kW-months/year | $13.30 |
Natural Gas | $83,108 | 20,575 | MMBtu | $4.04 |
TOTAL ENERGY COSTS | $600,683 | |||
RECOMMENDED SAVINGS* | $249,050 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Primary Product | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $33,786 Cost: $22,860 |
- | - | $33,786 | 2,541 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
$33,786 2,541 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,967 Cost: $250 |
$876 | 27,257 | $1,091 | 82 | - | - | - | - | - | - | - | - | - | - |
$876 27,257 kWh |
$1,091 82 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,420 Cost: $130 |
$1,077 | 33,705 | $1,343 | 101 | - | - | - | - | - | - | - | - | - | - |
$1,077 33,705 kWh |
$1,343 101 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2426 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR |
Savings: $3,592 Cost: $3,260 |
$3,592 | 213,658 | - | - | - | - | - | - | - | - | - | - | - | - |
$3,592 213,658 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $499 Cost: $279 |
$459 | 14,361 | - | - | $40 | 10 | - | - | - | - | - | - | - | - |
$459 14,361 kWh |
- - kW-months/year |
$40 10 MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $13,190 Cost: $8,000 |
$(-179) | (-2,638) | - | - | - | - | - | - | $13,369 | 432,000 | - | - | - | - |
$(-179) (-2,638) kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
$13,369 432,000 lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS |
Savings: $46,527 Cost: $1,000 |
- | - | - | - | - | - | $42,253 | 2,523 | - | - | $2,063 | - | $2,211 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$42,253 2,523 gal |
- - lb |
$2,063 - $ |
$2,211 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.1192 REDUCE SCRAP PRODUCTION |
Savings: $14,997 Cost: $18,800 |
$(-762) | (-10,551) | - | - | $(-3,151) | (-780) | $19,950 | 51,000 | - | - | $(-1,040) | - | - | - |
$(-762) (-10,551) kWh |
- - kW-months/year |
$(-3,151) (-780) MMBtu |
$19,950 51,000 gal |
- - lb |
$(-1,040) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.423 MOVE PRODUCT USING MECHANICAL MEANS |
Savings: $66,072 Cost: $3,200 |
- | - | - | - | - | - | - | - | - | - | - | - | $66,072 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
$66,072 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS |
Savings: $66,000 Cost: $1,280 |
- | - | - | - | - | - | - | - | - | - | - | - | $66,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
$66,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $249,050 Cost: $59,059 |
$5,063 | 275,792 | $36,220 | 2,724 | $(-3,111) | (-770) | $62,203 | 53,523 | $13,369 | 432,000 | $1,023 | - | $134,283 | - | $5,063 275,792 kWh |
$36,220 2,724 kW-months/year |
$(-3,111) (-770) MMBtu |
$62,203 53,523 gal |
$13,369 432,000 lb |
$1,023 - $ |
$134,283 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Primary Product | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Primary Product |