Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Arkansas |
---|---|
Assessment Year | 1998 |
Principal Product | Carpet Padding |
NAICS | n/a |
SIC | 3086 - Plastics Foam Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 60,000 |
Annual Production | 561,000 Pieces |
Production Hrs. Annual | 5,049 |
Location (State) | AR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $67,096 | 2,250,586 | kWh | $0.03 |
Electricity Demand | $45,904 | 8,315 | kW-months/year | $5.52 |
Natural Gas | $55,701 | 12,530 | MMBtu | $4.45 |
TOTAL ENERGY COSTS | $177,451 | |||
RECOMMENDED SAVINGS* | $105,274 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $3,678 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $311 Cost: $655 |
$214 | 7,034 | $97 | 18 | - | - | - | - | - | - | - | - |
$214 7,034 kWh |
$97 18 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $866 Cost: - |
$603 | 20,223 | $263 | 48 | - | - | - | - | - | - | - | - |
$603 20,223 kWh |
$263 48 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $272 Cost: $186 |
$167 | 5,569 | $105 | 19 | - | - | - | - | - | - | - | - |
$167 5,569 kWh |
$105 19 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,472 Cost: $50 |
$1,024 | 34,291 | $448 | 81 | - | - | - | - | - | - | - | - |
$1,024 34,291 kWh |
$448 81 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $757 Cost: $652 |
- | - | - | - | $757 | 170 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$757 170 MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $3,263 Cost: $8,000 |
$(-17) | (-586) | $(-40) | (-7) | - | - | - | - | $3,788 | 100,000 | $(-468) | - |
$(-17) (-586) kWh |
$(-40) (-7) kW-months/year |
- - MMBtu |
- - Tgal |
$3,788 100,000 lb |
$(-468) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) |
Savings: $374 Cost: $210 |
- | - | - | - | - | - | $374 | 374,000 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$374 374,000 Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT |
Savings: $97,959 Cost: $21,200 |
$(-318) | (-10,551) | $(-179) | (-32) | - | - | - | - | - | - | $98,456 | - |
$(-318) (-10,551) kWh |
$(-179) (-32) kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
$98,456 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $105,274 Cost: $30,953 |
$1,673 | 55,980 | $694 | 127 | $757 | 170 | $374 | 374,000 | $3,788 | 100,000 | $97,988 | - | $1,673 55,980 kWh |
$694 127 kW-months/year |
$757 170 MMBtu |
$374 374,000 Tgal |
$3,788 100,000 lb |
$97,988 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $3,678 Cost: $1,543 |
$2,008 | 67,117 | $913 | 166 | $757 | 170 | - | - | - | - | - | - | $2,008 67,117 kWh |
$913 166 kW-months/year |
$757 170 MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes |