Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Arkansas |
---|---|
Assessment Year | 1998 |
Principal Product | Industrial Valves |
NAICS | n/a |
SIC | 3491 - Industrial Valves |
Sales | $10,000,000-$50,000,000 |
# of Employees | 350 |
Plant Area (Sq.Ft.) | 266,000 |
Annual Production | 18,000,000 Pounds |
Production Hrs. Annual | 4,000 |
Location (State) | AR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,003,759 | 31,286,929 | kWh | $0.03 |
Electricity Demand | $1,174,894 | 94,879 | kW-months/year | $12.38 |
Natural Gas | $323,217 | 72,812 | MMBtu | $4.44 |
TOTAL ENERGY COSTS | $2,515,137 | |||
RECOMMENDED SAVINGS* | $109,879 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $93,232 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Other Liquid (haz) | Personnel Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Other Liquid (haz) | Personnel Changes | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | gal | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $8,477 Cost: $500 |
$4,396 | 137,456 | $4,081 | 330 | - | - | - | - | - | - |
$4,396 137,456 kWh |
$4,081 330 kW-months/year |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $637 Cost: $1,060 |
$269 | 8,499 | $368 | 30 | - | - | - | - | - | - |
$269 8,499 kWh |
$368 30 kW-months/year |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $4,475 Cost: - |
$1,330 | 41,618 | $3,145 | 254 | - | - | - | - | - | - |
$1,330 41,618 kWh |
$3,145 254 kW-months/year |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $3,792 Cost: $850 |
$1,819 | 56,858 | $1,973 | 159 | - | - | - | - | - | - |
$1,819 56,858 kWh |
$1,973 159 kW-months/year |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $40,673 Cost: $1,200 |
$17,278 | 540,152 | $23,395 | 1,890 | - | - | - | - | - | - |
$17,278 540,152 kWh |
$23,395 1,890 kW-months/year |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT |
Savings: $39,295 Cost: $91,825 |
$35,917 | 1,122,802 | $3,378 | 273 | - | - | - | - | - | - |
$35,917 1,122,802 kWh |
$3,378 273 kW-months/year |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE |
Savings: $3,600 Cost: $6,000 |
$(-148) | (-879) | - | - | $2,592 | 1,283 | $(-1,244) | - | $2,400 | - |
$(-148) (-879) kWh |
- - kW-months/year |
$2,592 1,283 gal |
$(-1,244) - $ |
$2,400 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS |
Savings: $4,787 Cost: $1,000 |
- | - | - | - | - | - | $4,787 | - | - | - |
- - kWh |
- - kW-months/year |
- - gal |
$4,787 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS |
Savings: $4,143 Cost: - |
- | - | - | - | - | - | $4,143 | - | - | - |
- - kWh |
- - kW-months/year |
- - gal |
$4,143 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $109,879 Cost: $102,435 |
$60,861 | 1,906,506 | $36,340 | 2,936 | $2,592 | 1,283 | $7,686 | - | $2,400 | - | $60,861 1,906,506 kWh |
$36,340 2,936 kW-months/year |
$2,592 1,283 gal |
$7,686 - $ |
$2,400 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $93,232 Cost: $94,525 |
$57,591 | 1,800,410 | $30,854 | 2,493 | - | - | $4,787 | - | - | - | $57,591 1,800,410 kWh |
$30,854 2,493 kW-months/year |
- - gal |
$4,787 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | gal | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Other Liquid (haz) | Personnel Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Other Liquid (haz) | Personnel Changes | Primary Raw Material |