IAC logo
IAC Assessment: AR0148
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0148
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1998
Principal Product Industrial Valves
NAICS n/a
SIC 3491 - Industrial Valves
Sales $10,000,000-$50,000,000
# of Employees 350
Plant Area (Sq.Ft.) 266,000
Annual Production 18,000,000 Pounds
Production Hrs. Annual 4,000
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,003,759 31,286,929 kWh $0.03
Electricity Demand $1,174,894 94,879 kW-months/year $12.38
Natural Gas $323,217 72,812 MMBtu $4.44
TOTAL ENERGY COSTS $2,515,137
RECOMMENDED SAVINGS* $109,879 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $93,232
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ gal $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,477
Cost:
$500
$4,396 137,456 $4,081 330 - - - - - - $4,396
137,456
kWh
$4,081
330
kW-months/year
-
-
gal
-
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$637
Cost:
$1,060
$269 8,499 $368 30 - - - - - - $269
8,499
kWh
$368
30
kW-months/year
-
-
gal
-
-
$
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,475
Cost:
-
$1,330 41,618 $3,145 254 - - - - - - $1,330
41,618
kWh
$3,145
254
kW-months/year
-
-
gal
-
-
$
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,792
Cost:
$850
$1,819 56,858 $1,973 159 - - - - - - $1,819
56,858
kWh
$1,973
159
kW-months/year
-
-
gal
-
-
$
-
-
$
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$40,673
Cost:
$1,200
$17,278 540,152 $23,395 1,890 - - - - - - $17,278
540,152
kWh
$23,395
1,890
kW-months/year
-
-
gal
-
-
$
-
-
$
06: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$39,295
Cost:
$91,825
$35,917 1,122,802 $3,378 273 - - - - - - $35,917
1,122,802
kWh
$3,378
273
kW-months/year
-
-
gal
-
-
$
-
-
$
07: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$3,600
Cost:
$6,000
$(-148) (-879) - - $2,592 1,283 $(-1,244) - $2,400 - $(-148)
(-879)
kWh
-
-
kW-months/year
$2,592
1,283
gal
$(-1,244)
-
$
$2,400
-
$
08: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$4,787
Cost:
$1,000
- - - - - - $4,787 - - - -
-
kWh
-
-
kW-months/year
-
-
gal
$4,787
-
$
-
-
$
09: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$4,143
Cost:
-
- - - - - - $4,143 - - - -
-
kWh
-
-
kW-months/year
-
-
gal
$4,143
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$109,879
Cost:
$102,435
$60,861 1,906,506 $36,340 2,936 $2,592 1,283 $7,686 - $2,400 - $60,861
1,906,506
kWh
$36,340
2,936
kW-months/year
$2,592
1,283
gal
$7,686
-
$
$2,400
-
$
TOTAL IMPLEMENTED Savings:
$93,232
Cost:
$94,525
$57,591 1,800,410 $30,854 2,493 - - $4,787 - - - $57,591
1,800,410
kWh
$30,854
2,493
kW-months/year
-
-
gal
$4,787
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ $ $ $
Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Primary Raw Material