IAC logo
IAC Assessment: AR0149
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0149
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1998
Principal Product Truck Slides
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 100,000
Annual Production 500,000 Pieces
Production Hrs. Annual 2,346
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $46,868 1,706,331 kWh $0.03
Electricity Demand $112,372 7,004 kW-months/year $16.04
Natural Gas $60,023 13,774 MMBtu $4.36
TOTAL ENERGY COSTS $223,192
RECOMMENDED SAVINGS* $126,526 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,698
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$605
Cost:
$140
$158 5,862 $447 28 - - - - $158
5,862
kWh
$447
28
kW-months/year
-
-
lb
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,237
Cost:
$360
$1,235 45,721 $3,002 187 - - - - $1,235
45,721
kWh
$3,002
187
kW-months/year
-
-
lb
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$576
Cost:
$538
$143 5,275 $433 27 - - - - $143
5,275
kWh
$433
27
kW-months/year
-
-
lb
-
-
$
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$4,280
Cost:
$240
$892 33,118 $3,388 211 - - - - $892
33,118
kWh
$3,388
211
kW-months/year
-
-
lb
-
-
$
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$5,476
Cost:
$8,000
$(-170) (-2,052) - - $7,605 338,000 $(-1,959) - $(-170)
(-2,052)
kWh
-
-
kW-months/year
$7,605
338,000
lb
$(-1,959)
-
$
06: 4.5140 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$5,836
Cost:
$500
- - - - - - $5,836 - -
-
kWh
-
-
kW-months/year
-
-
lb
$5,836
-
$
07: 3.2176 INCREASE USE OF AUTOMATION Savings:
$29,466
Cost:
$15,000
- - - - - - $29,466 - -
-
kWh
-
-
kW-months/year
-
-
lb
$29,466
-
$
08: 3.2176 INCREASE USE OF AUTOMATION Savings:
$76,050
Cost:
$215,000
- - - - - - $76,050 - -
-
kWh
-
-
kW-months/year
-
-
lb
$76,050
-
$
TOTAL RECOMMENDED Savings:
$126,526
Cost:
$239,778
$2,258 87,924 $7,270 453 $7,605 338,000 $109,393 - $2,258
87,924
kWh
$7,270
453
kW-months/year
$7,605
338,000
lb
$109,393
-
$
TOTAL IMPLEMENTED Savings:
$9,698
Cost:
$1,278
$2,428 89,976 $7,270 453 - - - - $2,428
89,976
kWh
$7,270
453
kW-months/year
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes