IAC logo
IAC Assessment: AR0153
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0153
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1998
Principal Product Automotive Equip.
NAICS n/a
SIC 3559 - Special Industry Machinery, Nec
Sales $50,000,000-$100,000,000
# of Employees 450
Plant Area (Sq.Ft.) 214,350
Annual Production 5,000 Pieces
Production Hrs. Annual 2,346
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $181,717 5,905,627 kWh $0.03
Electricity Demand $72,207 11,438 kW-months/year $6.31
Natural Gas $49,737 11,474 MMBtu $4.33
TOTAL ENERGY COSTS $309,642
RECOMMENDED SAVINGS* $190,679 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $175,742
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ Tgal $ lb $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$245
Cost:
$913
$176 5,862 $69 10 - - - - - - $176
5,862
kWh
$69
10
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$674
Cost:
-
$369 12,016 $305 45 - - - - - - $369
12,016
kWh
$305
45
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$764
Cost:
$540
$371 12,016 $393 58 - - - - - - $371
12,016
kWh
$393
58
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$14,173
Cost:
$1,565
$14,173 457,210 - - - - - - - - $14,173
457,210
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$1,917
Cost:
-
$(-194) (-8,499) - - - - $2,111 314,000 - - $(-194)
(-8,499)
kWh
-
-
kW-months/year
-
-
Tgal
$2,111
314,000
lb
-
-
$
06: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$2,493
Cost:
$1,000
- - - - $2,493 14,664,000 - - - - -
-
kWh
-
-
kW-months/year
$2,493
14,664,000
Tgal
-
-
lb
-
-
$
07: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$63,905
Cost:
$16,750
- - - - - - - - $63,905 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
$63,905
-
$
08: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$106,508
Cost:
$25,000
- - - - - - - - $106,508 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
$106,508
-
$
TOTAL RECOMMENDED Savings:
$190,679
Cost:
$45,768
$14,895 478,605 $767 113 $2,493 14,664,000 $2,111 314,000 $170,413 - $14,895
478,605
kWh
$767
113
kW-months/year
$2,493
14,664,000
Tgal
$2,111
314,000
lb
$170,413
-
$
TOTAL IMPLEMENTED Savings:
$175,742
Cost:
$43,663
$351 9,379 $374 55 $2,493 14,664,000 $2,111 314,000 $170,413 - $351
9,379
kWh
$374
55
kW-months/year
$2,493
14,664,000
Tgal
$2,111
314,000
lb
$170,413
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ lb $ $
Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes