IAC Assessment: AR0154
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0154
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1998
Principal Product Plastic Bathroom Accessories
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 81,000
Annual Production 290,000 Pieces
Production Hrs. Annual 4,693
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $106,518 3,208,675 kWh $0.03
Electricity Demand $119,794 10,785 kW-months/year $11.11
Natural Gas $49,770 9,923 MMBtu $5.02
TOTAL ENERGY COSTS $276,204
RECOMMENDED SAVINGS* $317,123 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $106,877
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Water Consumption
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ Tgal
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$99
Cost:
$207
$53 1,758 $46 4 - - - - - - - - $53
1,758
kWh
$46
4
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$49,699
Cost:
$135,000
$28,024 1,300,410 $28,949 2,606 $(-7,274) (-1,449) - - - - - - $28,024
1,300,410
kWh
$28,949
2,606
kW-months/year
$(-7,274)
(-1,449)
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
03: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$4,517
Cost:
$6,800
$(-232) (-7,034) $(-200) (-18) - - $104 52,092 - - $4,845 - $(-232)
(-7,034)
kWh
$(-200)
(-18)
kW-months/year
-
-
MMBtu
$104
52,092
Tgal
-
-
$
$4,845
-
Tgal
04: 4.4450 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$210,246
Cost:
$35,000
- - - - - - - - $210,246 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$210,246
-
$
-
-
Tgal
05: 4.5140 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$52,562
Cost:
-
- - - - - - - - $52,562 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$52,562
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$317,123
Cost:
$177,007
$27,845 1,295,134 $28,795 2,592 $(-7,274) (-1,449) $104 52,092 $262,808 - $4,845 - $27,845
1,295,134
kWh
$28,795
2,592
kW-months/year
$(-7,274)
(-1,449)
MMBtu
$104
52,092
Tgal
$262,808
-
$
$4,845
-
Tgal
TOTAL IMPLEMENTED Savings:
$106,877
Cost:
$142,007
$27,845 1,295,134 $28,795 2,592 $(-7,274) (-1,449) $104 52,092 $52,562 - $4,845 - $27,845
1,295,134
kWh
$28,795
2,592
kW-months/year
$(-7,274)
(-1,449)
MMBtu
$104
52,092
Tgal
$52,562
-
$
$4,845
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Water Consumption