Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Arkansas |
---|---|
Assessment Year | 1999 |
Principal Product | Gas valves |
NAICS | n/a |
SIC | 3491 - Industrial Valves |
Sales | $10,000,000-$50,000,000 |
# of Employees | 349 |
Plant Area (Sq.Ft.) | 142,618 |
Annual Production | 1,000,000 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | AR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $256,325 | 10,296,307 | kWh | $0.02 |
Electricity Demand | $236,312 | 20,135 | kW-months/year | $11.74 |
Natural Gas | $22,401 | 4,195 | MMBtu | $5.34 |
TOTAL ENERGY COSTS | $523,012 | |||
RECOMMENDED SAVINGS* | $91,778 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $59,042 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | gal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,102 Cost: $270 |
$1,113 | 44,549 | $989 | 86 | - | - | - | - | - | - |
$1,113 44,549 kWh |
$989 86 kW-months/year |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $636 Cost: $952 |
$323 | 12,896 | $313 | 27 | - | - | - | - | - | - |
$323 12,896 kWh |
$313 27 kW-months/year |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $3,144 Cost: $3,881 |
$1,664 | 83,236 | $1,480 | 128 | - | - | - | - | - | - |
$1,664 83,236 kWh |
$1,480 128 kW-months/year |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS |
Savings: $27,490 Cost: $5,600 |
- | - | - | - | $25,825 | 1,033 | $1,665 | 3,145 | - | - |
- - kWh |
- - kW-months/year |
$25,825 1,033 gal |
$1,665 3,145 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS |
Savings: $29,203 Cost: - |
- | - | - | - | - | - | - | - | $29,203 | - |
- - kWh |
- - kW-months/year |
- - gal |
- - lb |
$29,203 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.2176 INCREASE USE OF AUTOMATION |
Savings: $29,203 Cost: $25,000 |
- | - | - | - | - | - | - | - | $29,203 | - |
- - kWh |
- - kW-months/year |
- - gal |
- - lb |
$29,203 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $91,778 Cost: $35,703 |
$3,100 | 140,681 | $2,782 | 241 | $25,825 | 1,033 | $1,665 | 3,145 | $58,406 | - | $3,100 140,681 kWh |
$2,782 241 kW-months/year |
$25,825 1,033 gal |
$1,665 3,145 lb |
$58,406 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $59,042 Cost: $25,952 |
$323 | 12,896 | $313 | 27 | - | - | - | - | $58,406 | - | $323 12,896 kWh |
$313 27 kW-months/year |
- - gal |
- - lb |
$58,406 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | gal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Solid Waste (non-haz) | Personnel Changes |