IAC Assessment: AR0162
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0162
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1999
Principal Product Gas valves
NAICS n/a
SIC 3491 - Industrial Valves
Sales $10,000,000-$50,000,000
# of Employees 349
Plant Area (Sq.Ft.) 142,618
Annual Production 1,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $256,325 10,296,307 kWh $0.02
Electricity Demand $236,312 20,135 kW-months/year $11.74
Natural Gas $22,401 4,195 MMBtu $5.34
TOTAL ENERGY COSTS $523,012
RECOMMENDED SAVINGS* $91,778 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $59,042
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ gal $ lb $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,102
Cost:
$270
$1,113 44,549 $989 86 - - - - - - $1,113
44,549
kWh
$989
86
kW-months/year
-
-
gal
-
-
lb
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$636
Cost:
$952
$323 12,896 $313 27 - - - - - - $323
12,896
kWh
$313
27
kW-months/year
-
-
gal
-
-
lb
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,144
Cost:
$3,881
$1,664 83,236 $1,480 128 - - - - - - $1,664
83,236
kWh
$1,480
128
kW-months/year
-
-
gal
-
-
lb
-
-
$
04: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$27,490
Cost:
$5,600
- - - - $25,825 1,033 $1,665 3,145 - - -
-
kWh
-
-
kW-months/year
$25,825
1,033
gal
$1,665
3,145
lb
-
-
$
05: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$29,203
Cost:
-
- - - - - - - - $29,203 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
$29,203
-
$
06: 3.2176 INCREASE USE OF AUTOMATION Savings:
$29,203
Cost:
$25,000
- - - - - - - - $29,203 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
$29,203
-
$
TOTAL RECOMMENDED Savings:
$91,778
Cost:
$35,703
$3,100 140,681 $2,782 241 $25,825 1,033 $1,665 3,145 $58,406 - $3,100
140,681
kWh
$2,782
241
kW-months/year
$25,825
1,033
gal
$1,665
3,145
lb
$58,406
-
$
TOTAL IMPLEMENTED Savings:
$59,042
Cost:
$25,952
$323 12,896 $313 27 - - - - $58,406 - $323
12,896
kWh
$313
27
kW-months/year
-
-
gal
-
-
lb
$58,406
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ lb $ $
Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes