IAC logo
IAC Assessment: AR0168
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0168
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1999
Principal Product Ceramic wall and floor tile
NAICS n/a
SIC 3253 - Ceramic Wall And Floor Tile
Sales $1,000,000-$5,000,000
# of Employees 95
Plant Area (Sq.Ft.) 400,000
Annual Production 3,000 Tons
Production Hrs. Annual 2,080
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $98,959 1,811,254 kWh $0.05
Electricity Demand $54,090 7,364 kW-months/year $7.35
Natural Gas $132,907 48,710 MMBtu $2.73
TOTAL ENERGY COSTS $295,299
RECOMMENDED SAVINGS* $33,896 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,239
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Personnel Changes Electricity Usage Electricity Demand Water Disposal Personnel Changes
$ kWh $ kW-months/year $ Tgal $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,016
Cost:
$608
$262 4,689 $754 17 - - - - $262
4,689
kWh
$754
17
kW-months/year
-
-
Tgal
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$223
Cost:
-
$162 2,931 $61 8 - - - - $162
2,931
kWh
$61
8
kW-months/year
-
-
Tgal
-
-
$
03: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$11,649
Cost:
$7,750
$(-427) (-7,913) $(-296) (-40) $12,372 6,248 - - $(-427)
(-7,913)
kWh
$(-296)
(-40)
kW-months/year
$12,372
6,248
Tgal
-
-
$
04: 4.425 ELIMINATE/REDUCE REDUNDANT INSPECTIONS Savings:
$21,008
Cost:
$100
- - - - - - $21,008 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$21,008
-
$
TOTAL RECOMMENDED Savings:
$33,896
Cost:
$8,458
$(-3) (-293) $519 (-15) $12,372 6,248 $21,008 - $(-3)
(-293)
kWh
$519
(-15)
kW-months/year
$12,372
6,248
Tgal
$21,008
-
$
TOTAL IMPLEMENTED Savings:
$1,239
Cost:
$608
$424 7,620 $815 25 - - - - $424
7,620
kWh
$815
25
kW-months/year
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $