IAC logo
IAC Assessment: AR0181
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0181
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 2000
Principal Product Steel Fabrication
NAICS n/a
SIC 3441 - Fabricated Structural Metal
Sales n/a
# of Employees 140
Plant Area (Sq.Ft.) 78,000
Annual Production 31,200,000 Pounds
Production Hrs. Annual 6,240
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $35,042 1,192,556 kWh $0.03
Electricity Demand $41,011 3,933 kW-months/year $10.43
Natural Gas $6,095 1,252 MMBtu $4.87
TOTAL ENERGY COSTS $104,951
RECOMMENDED SAVINGS* $34,083 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $30,531
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Primary Product Electricity Usage Electricity Demand Water Disposal Primary Product
$ kWh $ kW-months/year $ Tgal $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$368
Cost:
$340
$312 1,172 $56 46 - - - - $312
1,172
kWh
$56
46
kW-months/year
-
-
Tgal
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,363
Cost:
$500
$2,834 97,890 $3,529 338 - - - - $2,834
97,890
kWh
$3,529
338
kW-months/year
-
-
Tgal
-
-
$
03: 3.5111 FILTER AND REUSE HYDRAULIC OIL Savings:
$3,552
Cost:
$1,500
- - - - $3,552 - - - -
-
kWh
-
-
kW-months/year
$3,552
-
Tgal
-
-
$
04: 4.425 ELIMINATE/REDUCE REDUNDANT INSPECTIONS Savings:
$23,800
Cost:
$16,000
- - - - - - $23,800 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$23,800
-
$
TOTAL RECOMMENDED Savings:
$34,083
Cost:
$18,340
$3,146 99,062 $3,585 384 $3,552 - $23,800 - $3,146
99,062
kWh
$3,585
384
kW-months/year
$3,552
-
Tgal
$23,800
-
$
TOTAL IMPLEMENTED Savings:
$30,531
Cost:
$16,840
$3,146 99,062 $3,585 384 - - $23,800 - $3,146
99,062
kWh
$3,585
384
kW-months/year
-
-
Tgal
$23,800
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $
Electricity Usage Electricity Demand Water Disposal Primary Product Electricity Usage Electricity Demand Water Disposal Primary Product