IAC Assessment: AR0186
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0186
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 2000
Principal Product Discounted Office Furniture
NAICS n/a
SIC 2521 - Wood Office Furniture
Sales >$500,000,000
# of Employees 400
Plant Area (Sq.Ft.) 657,384
Annual Production 997,000 Pieces
Production Hrs. Annual 5,616
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $378,695 13,792,497 kWh $0.03
Electricity Demand $167,798 33,724 kW-months/year $4.98
Natural Gas $43,022 6,483 MMBtu $6.64
TOTAL ENERGY COSTS $600,430
RECOMMENDED SAVINGS* $96,369 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $31,780
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product
$ kWh $ kW-months/year $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,117
Cost:
$23,976
$11,122 300,996 $2,995 601 - - - - $11,122
300,996
kWh
$2,995
601
kW-months/year
-
-
lb
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$8,772
Cost:
$800
$7,297 215,709 $1,475 296 - - - - $7,297
215,709
kWh
$1,475
296
kW-months/year
-
-
lb
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$17,663
Cost:
$54,855
- - $17,663 3,547 - - - - -
-
kWh
$17,663
3,547
kW-months/year
-
-
lb
-
-
$
04: 3.5216 RECYCLE NONFERROUS DUST Savings:
$28,860
Cost:
-
- - - - $28,860 - - - -
-
kWh
-
-
kW-months/year
$28,860
-
lb
-
-
$
05: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$26,957
Cost:
$400
- - - - - - $26,957 - -
-
kWh
-
-
kW-months/year
-
-
lb
$26,957
-
$
TOTAL RECOMMENDED Savings:
$96,369
Cost:
$80,031
$18,419 516,705 $22,133 4,444 $28,860 - $26,957 - $18,419
516,705
kWh
$22,133
4,444
kW-months/year
$28,860
-
lb
$26,957
-
$
TOTAL IMPLEMENTED Savings:
$31,780
Cost:
$78,831
$11,122 300,996 $20,658 4,148 - - - - $11,122
300,996
kWh
$20,658
4,148
kW-months/year
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product