IAC Assessment: AR0194
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0194
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 2000
Principal Product Wire and Cable
NAICS n/a
SIC 3357 - Nonferrous Wiredrawing & Insulating
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 400,000
Annual Production 21,000 Tons
Production Hrs. Annual 6,000
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $233,397 10,435,815 kWh $0.02
Electricity Demand $270,791 21,191 kW-months/year $12.78
Natural Gas $147,757 30,449 MMBtu $4.85
TOTAL ENERGY COSTS $665,279
RECOMMENDED SAVINGS* $66,837 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Personnel Changes Primary Product Electricity Usage Electricity Demand Water Disposal Personnel Changes Primary Product
$ kWh $ kW-months/year $ Tgal $ $ $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$34,500
Cost:
$78,525
- - $9,750 763 - - $24,750 - - - -
-
kWh
$9,750
763
kW-months/year
-
-
Tgal
$24,750
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,287
Cost:
$1,089
$273 12,309 $3,014 236 - - - - - - $273
12,309
kWh
$3,014
236
kW-months/year
-
-
Tgal
-
-
$
-
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$10,342
Cost:
$6,200
$5,358 243,552 $4,984 390 - - - - - - $5,358
243,552
kWh
$4,984
390
kW-months/year
-
-
Tgal
-
-
$
-
-
$
04: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$13,959
Cost:
$8,000
- - - - $13,959 - - - - - -
-
kWh
-
-
kW-months/year
$13,959
-
Tgal
-
-
$
-
-
$
05: 4.5140 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$4,749
Cost:
-
- - - - - - - - $4,749 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
$4,749
-
$
TOTAL RECOMMENDED Savings:
$66,837
Cost:
$93,814
$5,631 255,861 $17,748 1,389 $13,959 - $24,750 - $4,749 - $5,631
255,861
kWh
$17,748
1,389
kW-months/year
$13,959
-
Tgal
$24,750
-
$
$4,749
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $ $ $
Electricity Usage Electricity Demand Water Disposal Personnel Changes Primary Product Electricity Usage Electricity Demand Water Disposal Personnel Changes Primary Product