Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1991
Principal Product EXTRUDED ALUMINUM
NAICS n/a
SIC 3354 - Aluminum Extruded Products
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 0
Annual Production 20,000,000 Pounds
Production Hrs. Annual 7,488
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $249,485 4,449,004 kWh $0.06
Natural Gas $82,738 41,369 MMBtu $2.00
TOTAL ENERGY COSTS $332,223
RECOMMENDED SAVINGS* $14,589 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,774
Cost:
$4,910
$1,774 31,653 $1,774
31,653
kWh
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,078
Cost:
-
$4,078 72,685 $4,078
72,685
kWh
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,442
Cost:
$40
$3,442 61,547 $3,442
61,547
kWh
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,845
Cost:
$100
$1,845 32,825 $1,845
32,825
kWh
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,450
Cost:
$2,862
$3,450 61,547 $3,450
61,547
kWh
TOTAL RECOMMENDED Savings:
$14,589
Cost:
$7,912
$14,589 260,257 $14,589
260,257
kWh
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - -
-
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage