IAC logo
IAC Assessment: AS0044
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0044
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1991
Principal Product COMPUTER COMPONENTS
NAICS n/a
SIC 3575 - Computer Terminals
Sales $50,000,000-$100,000,000
# of Employees 120
Plant Area (Sq.Ft.) 0
Annual Production 45,000 Pieces
Production Hrs. Annual 2,450
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $257,861 3,860,786 kWh $0.07
TOTAL ENERGY COSTS $257,861
RECOMMENDED SAVINGS* $56,373 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $56,373
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$23,526
Cost:
-
$23,526 352,286 - - $23,526
352,286
kWh
-
-
$
02: 2.7422 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT Savings:
$1,984
Cost:
$7,500
$1,984 29,601 - - $1,984
29,601
kWh
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$994
Cost:
-
$1,769 26,377 $(-775) - $1,769
26,377
kWh
$(-775)
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,142
Cost:
$12,130
$1,142 16,999 - - $1,142
16,999
kWh
-
-
$
05: 2.7123 KEEP LAMPS AND REFLECTORS CLEAN Savings:
$9,959
Cost:
$3,003
$9,959 149,179 - - $9,959
149,179
kWh
-
-
$
06: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,172
Cost:
$1,050
$1,172 17,585 - - $1,172
17,585
kWh
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$296
Cost:
$386
$296 4,396 - - $296
4,396
kWh
-
-
$
08: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$100
Cost:
-
$100 1,465 - - $100
1,465
kWh
-
-
$
09: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$17,200
Cost:
$50,250
$17,200 - - - $17,200
-
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$56,373
Cost:
$74,319
$57,148 597,888 $(-775) - $57,148
597,888
kWh
$(-775)
-
$
TOTAL IMPLEMENTED Savings:
$56,373
Cost:
$74,319
$57,148 597,888 $(-775) - $57,148
597,888
kWh
$(-775)
-
$
Savings
Cost
$ kWh $ $