IAC logo
IAC Assessment: AS0078
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0078
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1993
Principal Product MACHINERY, ANODIZING
NAICS n/a
SIC 3471 - Plating And Polishing
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 0
Annual Production 1,200 Pieces
Production Hrs. Annual 5,928
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $255,492 2,492,673 kWh $0.10
TOTAL ENERGY COSTS $255,492
RECOMMENDED SAVINGS* $229,643 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $56,430
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$167,933
Cost:
$370,044
$192,231 1,393,025 $(-45,194) (-14,079) $20,896 - $192,231
1,393,025
kWh
$(-45,194)
(-14,079)
MMBtu
$20,896
-
$
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$54,544
Cost:
$70,044
$88,927 867,526 $(-34,383) (-6,877) - - $88,927
867,526
kWh
$(-34,383)
(-6,877)
MMBtu
-
-
$
03: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM Savings:
$403
Cost:
$1,200
$403 3,810 - - - - $403
3,810
kWh
-
-
MMBtu
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,061
Cost:
$10,100
$5,061 49,531 - - - - $5,061
49,531
kWh
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,119
Cost:
-
$1,191 9,672 - - $(-72) - $1,191
9,672
kWh
-
-
MMBtu
$(-72)
-
$
06: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$364
Cost:
-
$364 3,517 - - - - $364
3,517
kWh
-
-
MMBtu
-
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$219
Cost:
$450
$219 2,052 - - - - $219
2,052
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$229,643
Cost:
$451,838
$288,396 2,329,133 $(-79,577) (-20,956) $20,824 - $288,396
2,329,133
kWh
$(-79,577)
(-20,956)
MMBtu
$20,824
-
$
TOTAL IMPLEMENTED Savings:
$56,430
Cost:
$71,244
$90,885 884,525 $(-34,383) (-6,877) $(-72) - $90,885
884,525
kWh
$(-34,383)
(-6,877)
MMBtu
$(-72)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes