IAC logo
IAC Assessment: AS0096
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0096
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1993
Principal Product ELECTRICAL POWER EQUIP.
NAICS n/a
SIC 3679 - Electronic Components, Nec
Sales $10,000,000-$50,000,000
# of Employees 215
Plant Area (Sq.Ft.) 0
Annual Production 20,000,000 Pieces
Production Hrs. Annual 4,550
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $229,181 2,643,904 kWh $0.09
Natural Gas $11,577 2,020 MMBtu $5.73
TOTAL ENERGY COSTS $240,758
RECOMMENDED SAVINGS* $23,541 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,330
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.7131 ADD AREA LIGHTING SWITCHES Savings:
$1,219
Cost:
$2,012
$1,219 14,068 $1,219
14,068
kWh
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,441
Cost:
-
$2,441 28,136 $2,441
28,136
kWh
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$369
Cost:
$497
$369 4,396 $369
4,396
kWh
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$628
Cost:
-
$628 7,327 $628
7,327
kWh
05: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT Savings:
$4,006
Cost:
$7,200
$4,006 46,307 $4,006
46,307
kWh
06: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$8,455
Cost:
$9,000
$8,455 97,597 $8,455
97,597
kWh
07: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$516
Cost:
$200
$516 5,862 $516
5,862
kWh
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$909
Cost:
$500
$909 10,551 $909
10,551
kWh
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$792
Cost:
$150
$792 9,086 $792
9,086
kWh
10: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,451
Cost:
$4,000
$2,451 28,429 $2,451
28,429
kWh
11: 2.2522 ISOLATE HOT OR COLD EQUIPMENT Savings:
$1,577
Cost:
$300
$1,577 18,171 $1,577
18,171
kWh
12: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$178
Cost:
$100
$178 2,052 $178
2,052
kWh
TOTAL RECOMMENDED Savings:
$23,541
Cost:
$23,959
$23,541 271,982 $23,541
271,982
kWh
TOTAL IMPLEMENTED Savings:
$10,330
Cost:
$10,112
$10,330 119,285 $10,330
119,285
kWh