IAC logo
IAC Assessment: AS0105
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0105
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1993
Principal Product COLD DRAWN AL TUBING
NAICS n/a
SIC 3354 - Aluminum Extruded Products
Sales $5,000,000-$10,000,000
# of Employees 60
Plant Area (Sq.Ft.) 0
Annual Production 1,500,000 Pounds
Production Hrs. Annual 4,420
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $119,286 1,827,081 kWh $0.07
Natural Gas $137,139 31,420 MMBtu $4.36
TOTAL ENERGY COSTS $256,425
RECOMMENDED SAVINGS* $28,912 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,497
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$157
Cost:
$12,760
$2,467 37,808 - - $(-2,310) - $2,467
37,808
kWh
-
-
MMBtu
$(-2,310)
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$75
Cost:
$147
$109 1,758 - - $(-34) - $109
1,758
kWh
-
-
MMBtu
$(-34)
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$546
Cost:
$900
$546 8,499 - - - - $546
8,499
kWh
-
-
MMBtu
-
-
$
04: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$623
Cost:
$1,230
$310 4,689 - - $313 - $310
4,689
kWh
-
-
MMBtu
$313
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,244
Cost:
$350
$1,244 19,050 - - - - $1,244
19,050
kWh
-
-
MMBtu
-
-
$
06: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT Savings:
$1,746
Cost:
-
$1,746 26,671 - - - - $1,746
26,671
kWh
-
-
MMBtu
-
-
$
07: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$551
Cost:
$500
- - $551 126 - - -
-
kWh
$551
126
MMBtu
-
-
$
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$16,707
Cost:
$2,040
- - $16,707 3,832 - - -
-
kWh
$16,707
3,832
MMBtu
-
-
$
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,707
Cost:
$820
- - $1,707 391 - - -
-
kWh
$1,707
391
MMBtu
-
-
$
10: 2.2514 COVER OPEN TANKS Savings:
$5,556
Cost:
-
- - $5,556 1,274 - - -
-
kWh
$5,556
1,274
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$28,912
Cost:
$18,747
$6,422 98,475 $24,521 5,623 $(-2,031) - $6,422
98,475
kWh
$24,521
5,623
MMBtu
$(-2,031)
-
$
TOTAL IMPLEMENTED Savings:
$11,497
Cost:
$3,447
$3,955 60,667 $7,263 1,665 $279 - $3,955
60,667
kWh
$7,263
1,665
MMBtu
$279
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes