IAC logo
IAC Assessment: AS0137
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0137
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1995
Principal Product Printed Circuit Boards
NAICS n/a
SIC 3672 - Printed Circuit Boards
Sales $1,000,000-$5,000,000
# of Employees 70
Plant Area (Sq.Ft.) 20,000
Annual Production 5,000,000 Pieces
Production Hrs. Annual 5,252
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $87,937 987,397 kWh $0.09
Natural Gas $5,158 854 MMBtu $6.04
TOTAL ENERGY COSTS $93,095
RECOMMENDED SAVINGS* $7,541 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,305
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$697
Cost:
$300
$697 7,913 - - $697
7,913
kWh
-
-
MMBtu
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,836
Cost:
$1,706
$1,836 20,516 - - $1,836
20,516
kWh
-
-
MMBtu
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$163
Cost:
-
$163 1,758 - - $163
1,758
kWh
-
-
MMBtu
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$992
Cost:
$2,275
$1,266 14,068 $(-274) (-45) $1,266
14,068
kWh
$(-274)
(-45)
MMBtu
05: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$2,091
Cost:
$9,000
$2,091 23,447 - - $2,091
23,447
kWh
-
-
MMBtu
06: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$1,608
Cost:
-
$1,608 18,171 - - $1,608
18,171
kWh
-
-
MMBtu
07: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$154
Cost:
$750
$154 1,758 - - $154
1,758
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$7,541
Cost:
$14,031
$7,815 87,631 $(-274) (-45) $7,815
87,631
kWh
$(-274)
(-45)
MMBtu
TOTAL IMPLEMENTED Savings:
$2,305
Cost:
$300
$2,305 26,084 - - $2,305
26,084
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas