IAC logo
IAC Assessment: AS0147
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0147
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1995
Principal Product Phone Booths & Generator Enclosures
NAICS n/a
SIC 3499 - Fabricated Metal Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 77
Plant Area (Sq.Ft.) 46,715
Annual Production 3,680 Pieces
Production Hrs. Annual 4,500
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $42,326 362,544 kWh $0.12
LPG $12,507 906 MMBtu $13.80
TOTAL ENERGY COSTS $54,833
RECOMMENDED SAVINGS* $6,890 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,535
#|Description Savings
Cost
Status Electricity Usage LPG Electricity Usage LPG
$ kWh $ MMBtu
01: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$4,355
Cost:
$8,475
- - $4,355 318 -
-
kWh
$4,355
318
MMBtu
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$317
Cost:
$150
- - $317 23 -
-
kWh
$317
23
MMBtu
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,444
Cost:
$2,213
$1,444 12,896 - - $1,444
12,896
kWh
-
-
MMBtu
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$320
Cost:
-
$320 2,931 - - $320
2,931
kWh
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$454
Cost:
$150
$454 4,689 - - $454
4,689
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$6,890
Cost:
$10,988
$2,218 20,516 $4,672 341 $2,218
20,516
kWh
$4,672
341
MMBtu
TOTAL IMPLEMENTED Savings:
$2,535
Cost:
$2,513
$2,218 20,516 $317 23 $2,218
20,516
kWh
$317
23
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage LPG Electricity Usage LPG