IAC logo
IAC Assessment: AS0175
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0175
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1996
Principal Product Printing Circuit Board
NAICS n/a
SIC 3672 - Printed Circuit Boards
Sales $5,000,000-$10,000,000
# of Employees 115
Plant Area (Sq.Ft.) 38,000
Annual Production 0 Units
Production Hrs. Annual 6,000
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $289,141 4,572,685 kWh $0.06
Electricity Demand $32,325 10,147 kW-months/year $3.19
TOTAL ENERGY COSTS $339,286
RECOMMENDED SAVINGS* $61,298 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,001
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (haz) Water Consumption Electricity Usage Electricity Demand Solid Waste (haz) Water Consumption
$ kWh $ kW-months/year $ lb $ Tgal
01: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$3,647
Cost:
$11,000
$3,313 52,462 $334 105 - - - - $3,313
52,462
kWh
$334
105
kW-months/year
-
-
lb
-
-
Tgal
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,105
Cost:
$6,800
$4,638 73,271 $467 147 - - - - $4,638
73,271
kWh
$467
147
kW-months/year
-
-
lb
-
-
Tgal
03: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$6,925
Cost:
$6,300
$5,677 89,683 $1,248 392 - - - - $5,677
89,683
kWh
$1,248
392
kW-months/year
-
-
lb
-
-
Tgal
04: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$27,635
Cost:
$25,000
$34,214 541,032 $4,722 1,482 - - $(-11,301) - $34,214
541,032
kWh
$4,722
1,482
kW-months/year
-
-
lb
$(-11,301)
-
Tgal
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,625
Cost:
$1,350
$1,625 25,791 - - - - - - $1,625
25,791
kWh
-
-
kW-months/year
-
-
lb
-
-
Tgal
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,214
Cost:
$21,652
$6,511 102,872 $703 221 - - - - $6,511
102,872
kWh
$703
221
kW-months/year
-
-
lb
-
-
Tgal
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$237
Cost:
$499
$222 3,517 $15 5 - - - - $222
3,517
kWh
$15
5
kW-months/year
-
-
lb
-
-
Tgal
08: 3.6112 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME Savings:
$8,910
Cost:
$1,200
- - - - $8,910 90,000 - - -
-
kWh
-
-
kW-months/year
$8,910
90,000
lb
-
-
Tgal
TOTAL RECOMMENDED Savings:
$61,298
Cost:
$73,801
$56,200 888,628 $7,489 2,352 $8,910 90,000 $(-11,301) - $56,200
888,628
kWh
$7,489
2,352
kW-months/year
$8,910
90,000
lb
$(-11,301)
-
Tgal
TOTAL IMPLEMENTED Savings:
$16,001
Cost:
$29,801
$14,035 221,863 $1,966 618 - - - - $14,035
221,863
kWh
$1,966
618
kW-months/year
-
-
lb
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ lb $ Tgal
Electricity Usage Electricity Demand Solid Waste (haz) Water Consumption Electricity Usage Electricity Demand Solid Waste (haz) Water Consumption