Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1996
Principal Product Electronic Components for Stereo Systems
NAICS n/a
SIC 3679 - Electronic Components, Nec
Sales $50,000,000-$100,000,000
# of Employees 150
Plant Area (Sq.Ft.) 120,000
Annual Production 204,000 Pieces
Production Hrs. Annual 4,896
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $120,735 1,859,906 kWh $0.06
Electricity Demand $13,030 6,006 kW-months/year $2.17
TOTAL ENERGY COSTS $133,765
RECOMMENDED SAVINGS* $15,666 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $444
#|Description Savings
Cost
Status Electricity Usage Electricity Demand By-product Production Electricity Usage Electricity Demand By-product Production
$ kWh $ kW-months/year $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$636
Cost:
-
$588 9,086 $48 22 - - $588
9,086
kWh
$48
22
kW-months/year
-
-
$
02: 2.7131 ADD AREA LIGHTING SWITCHES Savings:
$1,982
Cost:
-
$1,873 29,015 $109 50 - - $1,873
29,015
kWh
$109
50
kW-months/year
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$660
Cost:
$900
$660 10,258 - - - - $660
10,258
kWh
-
-
kW-months/year
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,531
Cost:
$13,132
$6,122 94,373 $409 189 - - $6,122
94,373
kWh
$409
189
kW-months/year
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$204
Cost:
$390
$195 2,931 $9 4 - - $195
2,931
kWh
$9
4
kW-months/year
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$444
Cost:
$180
$410 6,448 $34 15 - - $410
6,448
kWh
$34
15
kW-months/year
-
-
$
07: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$3,289
Cost:
$8,800
$2,782 42,790 $507 234 - - $2,782
42,790
kWh
$507
234
kW-months/year
-
-
$
08: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$1,920
Cost:
-
- - - - $1,920 - -
-
kWh
-
-
kW-months/year
$1,920
-
$
TOTAL RECOMMENDED Savings:
$15,666
Cost:
$23,402
$12,630 194,901 $1,116 514 $1,920 - $12,630
194,901
kWh
$1,116
514
kW-months/year
$1,920
-
$
TOTAL IMPLEMENTED Savings:
$444
Cost:
$180
$410 6,448 $34 15 - - $410
6,448
kWh
$34
15
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand By-product Production Electricity Usage Electricity Demand By-product Production