IAC logo
IAC Assessment: AS0185
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0185
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1996
Principal Product Bread
NAICS n/a
SIC 2051 - Bread, Cake, And Related Products
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 120,000
Annual Production 14,000,000 Pounds
Production Hrs. Annual 4,590
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $145,340 2,226,846 kWh $0.07
Electricity Demand $36,938 4,972 kW-months/year $7.43
TOTAL ENERGY COSTS $221,670
RECOMMENDED SAVINGS* $13,371 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,863
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)
$ kWh $ kW-months/year $ lb
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,866
Cost:
-
$1,866 29,015 - - - - $1,866
29,015
kWh
-
-
kW-months/year
-
-
lb
02: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$1,309
Cost:
$255
$845 13,189 $464 69 - - $845
13,189
kWh
$464
69
kW-months/year
-
-
lb
03: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$416
Cost:
$120
$175 2,638 $241 36 - - $175
2,638
kWh
$241
36
kW-months/year
-
-
lb
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$882
Cost:
$100
$657 10,258 $225 33 - - $657
10,258
kWh
$225
33
kW-months/year
-
-
lb
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,378
Cost:
$1,938
$1,866 29,015 $512 76 - - $1,866
29,015
kWh
$512
76
kW-months/year
-
-
lb
06: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$688
Cost:
$1,400
$429 7,913 $259 39 - - $429
7,913
kWh
$259
39
kW-months/year
-
-
lb
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,230
Cost:
$1,050
$1,230 19,343 - - - - $1,230
19,343
kWh
-
-
kW-months/year
-
-
lb
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$103
Cost:
$128
$80 1,172 $23 3 - - $80
1,172
kWh
$23
3
kW-months/year
-
-
lb
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$590
Cost:
$1,236
$415 6,448 $175 26 - - $415
6,448
kWh
$175
26
kW-months/year
-
-
lb
10: 3.7121 IMPROVE HANDLING PRACTICES Savings:
$3,909
Cost:
$1,500
- - - - $3,909 25,500 -
-
kWh
-
-
kW-months/year
$3,909
25,500
lb
TOTAL RECOMMENDED Savings:
$13,371
Cost:
$7,727
$7,563 118,991 $1,899 282 $3,909 25,500 $7,563
118,991
kWh
$1,899
282
kW-months/year
$3,909
25,500
lb
TOTAL IMPLEMENTED Savings:
$10,863
Cost:
$4,041
$5,489 85,287 $1,465 217 $3,909 25,500 $5,489
85,287
kWh
$1,465
217
kW-months/year
$3,909
25,500
lb
Savings
Cost
$ kWh $ kW-months/year $ lb