IAC Assessment: AS0195
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0195
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1996
Principal Product Antenna Systems and Related Equipment
NAICS n/a
SIC 3662 -
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 170,000
Annual Production 24,000 Pieces
Production Hrs. Annual 2,525
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $216,997 2,702,227 kWh $0.08
Electricity Demand $19,678 10,174 kW-months/year $1.93
TOTAL ENERGY COSTS $236,675
RECOMMENDED SAVINGS* $109,927 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $27,354
#|Description Savings
Cost
Status Electricity Usage Electricity Demand By-product Production Electricity Usage Electricity Demand By-product Production
$ kWh $ kW-months/year $ $
01: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$13,771
Cost:
$38,500
$12,422 234,760 $1,349 683 - - $12,422
234,760
kWh
$1,349
683
kW-months/year
-
-
$
02: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM Savings:
$6,617
Cost:
$13,200
$6,617 121,336 - - - - $6,617
121,336
kWh
-
-
kW-months/year
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$872
Cost:
$975
$872 16,413 - - - - $872
16,413
kWh
-
-
kW-months/year
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,057
Cost:
$1,120
$926 17,585 $131 66 - - $926
17,585
kWh
$131
66
kW-months/year
-
-
$
05: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$2,337
Cost:
-
$2,047 38,687 $290 147 - - $2,047
38,687
kWh
$290
147
kW-months/year
-
-
$
06: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$12,177
Cost:
-
$10,665 201,641 $1,512 766 - - $10,665
201,641
kWh
$1,512
766
kW-months/year
-
-
$
07: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$4,031
Cost:
-
$3,530 66,823 $501 253 - - $3,530
66,823
kWh
$501
253
kW-months/year
-
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$218
Cost:
-
$218 4,396 - - - - $218
4,396
kWh
-
-
kW-months/year
-
-
$
09: 2.7314 REDUCE VENTILATION AIR Savings:
$263
Cost:
$100
$263 4,982 - - - - $263
4,982
kWh
-
-
kW-months/year
-
-
$
10: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$900
Cost:
-
- - - - $900 - -
-
kWh
-
-
kW-months/year
$900
-
$
11: 4.511 EXPAND OPERATIONS INTO UNUSED SPACE Savings:
$67,684
Cost:
$10,000
- - - - $67,684 - -
-
kWh
-
-
kW-months/year
$67,684
-
$
TOTAL RECOMMENDED Savings:
$109,927
Cost:
$63,895
$37,560 706,623 $3,783 1,915 $68,584 - $37,560
706,623
kWh
$3,783
1,915
kW-months/year
$68,584
-
$
TOTAL IMPLEMENTED Savings:
$27,354
Cost:
$15,395
$24,920 467,467 $2,434 1,232 - - $24,920
467,467
kWh
$2,434
1,232
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand By-product Production Electricity Usage Electricity Demand By-product Production