IAC Assessment: AS0206
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0206
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1997
Principal Product Precision Machining
NAICS n/a
SIC 3471 - Plating And Polishing
Sales $1,000,000-$5,000,000
# of Employees 30
Plant Area (Sq.Ft.) 20,000
Annual Production 212,000 Pieces
Production Hrs. Annual 7,280
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $164,929 1,937,866 kWh $0.09
Electricity Demand $13,601 7,596 kW-months/year $1.79
Electricity Fees $12,634 - $ -
TOTAL ENERGY COSTS $200,358
RECOMMENDED SAVINGS* $32,136 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,059
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost By-product Production Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost By-product Production
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$10,800
Cost:
$7,000
$8,746 177,902 $2,054 250 - - - - - - $8,746
177,902
kWh
$2,054
250
kW-months/year
-
-
$
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,330
Cost:
$220
$1,817 36,928 $513 61 - - - - - - $1,817
36,928
kWh
$513
61
kW-months/year
-
-
$
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,393
Cost:
$2,503
$1,051 21,395 $342 40 - - - - - - $1,051
21,395
kWh
$342
40
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,124
Cost:
$225
$721 14,654 $403 48 - - - - - - $721
14,654
kWh
$403
48
kW-months/year
-
-
$
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$377
Cost:
$60
$294 5,862 $83 10 - - - - - - $294
5,862
kWh
$83
10
kW-months/year
-
-
$
-
-
$
-
-
$
06: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$2,352
Cost:
$30
- - - - $2,352 - - - - - -
-
kWh
-
-
kW-months/year
$2,352
-
$
-
-
$
-
-
$
07: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$1,760
Cost:
-
- - - - - - $1,760 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,760
-
$
-
-
$
08: 4.8110 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS Savings:
$12,000
Cost:
$100
- - - - - - - - $12,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$12,000
-
$
TOTAL RECOMMENDED Savings:
$32,136
Cost:
$10,138
$12,629 256,741 $3,395 409 $2,352 - $1,760 - $12,000 - $12,629
256,741
kWh
$3,395
409
kW-months/year
$2,352
-
$
$1,760
-
$
$12,000
-
$
TOTAL IMPLEMENTED Savings:
$5,059
Cost:
$310
$2,111 42,790 $596 71 $2,352 - - - - - $2,111
42,790
kWh
$596
71
kW-months/year
$2,352
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost By-product Production Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost By-product Production