Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Arizona State University |
---|---|
Assessment Year | 1997 |
Principal Product | Precision Machining |
NAICS | n/a |
SIC | 3471 - Plating And Polishing |
Sales | $1,000,000-$5,000,000 |
# of Employees | 30 |
Plant Area (Sq.Ft.) | 20,000 |
Annual Production | 212,000 Pieces |
Production Hrs. Annual | 7,280 |
Location (State) | AZ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $164,929 | 1,937,866 | kWh | $0.09 |
Electricity Demand | $13,601 | 7,596 | kW-months/year | $1.79 |
Electricity Fees | $12,634 | - | $ | - |
TOTAL ENERGY COSTS | $200,358 | |||
RECOMMENDED SAVINGS* | $32,136 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $5,059 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Administrative Changes | Ancillary Material Cost | By-product Production | Electricity Usage | Electricity Demand | Administrative Changes | Ancillary Material Cost | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $10,800 Cost: $7,000 |
$8,746 | 177,902 | $2,054 | 250 | - | - | - | - | - | - |
$8,746 177,902 kWh |
$2,054 250 kW-months/year |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,330 Cost: $220 |
$1,817 | 36,928 | $513 | 61 | - | - | - | - | - | - |
$1,817 36,928 kWh |
$513 61 kW-months/year |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,393 Cost: $2,503 |
$1,051 | 21,395 | $342 | 40 | - | - | - | - | - | - |
$1,051 21,395 kWh |
$342 40 kW-months/year |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $1,124 Cost: $225 |
$721 | 14,654 | $403 | 48 | - | - | - | - | - | - |
$721 14,654 kWh |
$403 48 kW-months/year |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $377 Cost: $60 |
$294 | 5,862 | $83 | 10 | - | - | - | - | - | - |
$294 5,862 kWh |
$83 10 kW-months/year |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $2,352 Cost: $30 |
- | - | - | - | $2,352 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,352 - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $1,760 Cost: - |
- | - | - | - | - | - | $1,760 | - | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$1,760 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.811 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS |
Savings: $12,000 Cost: $100 |
- | - | - | - | - | - | - | - | $12,000 | - |
- - kWh |
- - kW-months/year |
- - $ |
- - $ |
$12,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $32,136 Cost: $10,138 |
$12,629 | 256,741 | $3,395 | 409 | $2,352 | - | $1,760 | - | $12,000 | - | $12,629 256,741 kWh |
$3,395 409 kW-months/year |
$2,352 - $ |
$1,760 - $ |
$12,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $5,059 Cost: $310 |
$2,111 | 42,790 | $596 | 71 | $2,352 | - | - | - | - | - | $2,111 42,790 kWh |
$596 71 kW-months/year |
$2,352 - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Administrative Changes | Ancillary Material Cost | By-product Production | Electricity Usage | Electricity Demand | Administrative Changes | Ancillary Material Cost | By-product Production |