IAC logo
IAC Assessment: AS0215
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0215
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1997
Principal Product Powder Coating
NAICS n/a
SIC 3479 - Metal Coating And Allied Services
Sales $1,000,000-$5,000,000
# of Employees 45
Plant Area (Sq.Ft.) 15,000
Annual Production 5,000,000 Pieces
Production Hrs. Annual 4,000
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $65,138 642,145 kWh $0.10
Electricity Fees $6,297 - $ -
Natural Gas $15,731 3,569 MMBtu $4.41
TOTAL ENERGY COSTS $87,166
RECOMMENDED SAVINGS* $21,880 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,061
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Administrative Changes Electricity Usage Natural Gas Personnel Changes Administrative Changes
$ kWh $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,408
Cost:
$2,681
$1,408 12,896 - - - - - - $1,408
12,896
kWh
-
-
MMBtu
-
-
$
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$185
Cost:
$450
$185 1,758 - - - - - - $185
1,758
kWh
-
-
MMBtu
-
-
$
-
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$371
Cost:
$315
$371 3,224 - - - - - - $371
3,224
kWh
-
-
MMBtu
-
-
$
-
-
$
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$1,409
Cost:
$1,500
$1,409 12,896 - - - - - - $1,409
12,896
kWh
-
-
MMBtu
-
-
$
-
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$564
Cost:
$480
$564 5,275 - - - - - - $564
5,275
kWh
-
-
MMBtu
-
-
$
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$534
Cost:
$30
$534 4,982 - - - - - - $534
4,982
kWh
-
-
MMBtu
-
-
$
-
-
$
07: 3.7121 IMPROVE HANDLING PRACTICES Savings:
$370
Cost:
-
- - - - $370 - - - -
-
kWh
-
-
MMBtu
$370
-
$
-
-
$
08: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$192
Cost:
$15
- - - - - - $192 - -
-
kWh
-
-
MMBtu
-
-
$
$192
-
$
09: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$16,847
Cost:
$43,100
$31,831 290,739 $(-14,984) (-3,400) - - - - $31,831
290,739
kWh
$(-14,984)
(-3,400)
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$21,880
Cost:
$48,571
$36,302 331,770 $(-14,984) (-3,400) $370 - $192 - $36,302
331,770
kWh
$(-14,984)
(-3,400)
MMBtu
$370
-
$
$192
-
$
TOTAL IMPLEMENTED Savings:
$3,061
Cost:
$3,641
$2,691 24,911 - - $370 - - - $2,691
24,911
kWh
-
-
MMBtu
$370
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $ $ $
Electricity Usage Natural Gas Personnel Changes Administrative Changes Electricity Usage Natural Gas Personnel Changes Administrative Changes