Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Arizona State University |
---|---|
Assessment Year | 1998 |
Principal Product | Metal Shop |
NAICS | n/a |
SIC | 3599 - Industrial Machinery, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 60 |
Plant Area (Sq.Ft.) | 40,000 |
Annual Production | 33 Tons |
Production Hrs. Annual | 6,300 |
Location (State) | AZ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $69,280 | 1,098,183 | kWh | $0.06 |
Electricity Demand | $8,750 | 3,176 | kW-months/year | $2.76 |
Electricity Fees | $4,215 | - | $ | - |
TOTAL ENERGY COSTS | $84,954 | |||
RECOMMENDED SAVINGS* | $163,002 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Primary Product | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $885 Cost: $60 |
$814 | 14,947 | $71 | 11 | - | - | - | - | - | - | - | - |
$814 14,947 kWh |
$71 11 kW-months/year |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $385 Cost: $675 |
$294 | 5,275 | $91 | 14 | - | - | - | - | - | - | - | - |
$294 5,275 kWh |
$91 14 kW-months/year |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $1,253 Cost: $2,300 |
$1,253 | 22,860 | - | - | - | - | - | - | - | - | - | - |
$1,253 22,860 kWh |
- - kW-months/year |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $171 Cost: $261 |
$152 | 2,931 | $19 | 3 | - | - | - | - | - | - | - | - |
$152 2,931 kWh |
$19 3 kW-months/year |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $505 Cost: $675 |
$505 | 9,379 | - | - | - | - | - | - | - | - | - | - |
$505 9,379 kWh |
- - kW-months/year |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $936 Cost: $60 |
- | - | - | - | $936 | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$936 - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $603 Cost: $30 |
- | - | - | - | - | - | - | - | $603 | - | - | - |
- - kWh |
- - kW-months/year |
- - lb |
- - $ |
$603 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $158,264 Cost: $128,600 |
$(-9,281) | (-170,281) | $(-2,555) | (-405) | - | - | $(-157,500) | - | - | - | $327,600 | - |
$(-9,281) (-170,281) kWh |
$(-2,555) (-405) kW-months/year |
- - lb |
$(-157,500) - $ |
- - $ |
$327,600 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $163,002 Cost: $132,661 |
$(-6,263) | (-114,889) | $(-2,374) | (-377) | $936 | - | $(-157,500) | - | $603 | - | $327,600 | - | $(-6,263) (-114,889) kWh |
$(-2,374) (-377) kW-months/year |
$936 - lb |
$(-157,500) - $ |
$603 - $ |
$327,600 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Primary Product | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Primary Product |