IAC logo
IAC Assessment: AS0230
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0230
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1998
Principal Product Metal Shop
NAICS n/a
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 40,000
Annual Production 33 Tons
Production Hrs. Annual 6,300
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $69,280 1,098,183 kWh $0.06
Electricity Demand $8,750 3,176 kW-months/year $2.76
Electricity Fees $4,215 - $ -
TOTAL ENERGY COSTS $84,954
RECOMMENDED SAVINGS* $163,002 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Product
$ kWh $ kW-months/year $ lb $ $ $ $ $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$885
Cost:
$60
$814 14,947 $71 11 - - - - - - - - $814
14,947
kWh
$71
11
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$385
Cost:
$675
$294 5,275 $91 14 - - - - - - - - $294
5,275
kWh
$91
14
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,253
Cost:
$2,300
$1,253 22,860 - - - - - - - - - - $1,253
22,860
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$171
Cost:
$261
$152 2,931 $19 3 - - - - - - - - $152
2,931
kWh
$19
3
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
05: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$505
Cost:
$675
$505 9,379 - - - - - - - - - - $505
9,379
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
06: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$936
Cost:
$60
- - - - $936 - - - - - - - -
-
kWh
-
-
kW-months/year
$936
-
lb
-
-
$
-
-
$
-
-
$
07: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$603
Cost:
$30
- - - - - - - - $603 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$603
-
$
-
-
$
08: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$158,264
Cost:
$128,600
$(-9,281) (-170,281) $(-2,555) (-405) - - $(-157,500) - - - $327,600 - $(-9,281)
(-170,281)
kWh
$(-2,555)
(-405)
kW-months/year
-
-
lb
$(-157,500)
-
$
-
-
$
$327,600
-
$
TOTAL RECOMMENDED Savings:
$163,002
Cost:
$132,661
$(-6,263) (-114,889) $(-2,374) (-377) $936 - $(-157,500) - $603 - $327,600 - $(-6,263)
(-114,889)
kWh
$(-2,374)
(-377)
kW-months/year
$936
-
lb
$(-157,500)
-
$
$603
-
$
$327,600
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Product