IAC Assessment: AS0232
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0232
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1998
Principal Product Aluminum Containers
NAICS n/a
SIC 3411 - Metal Cans
Sales $50,000,000-$100,000,000
# of Employees 80
Plant Area (Sq.Ft.) 100,000
Annual Production 1,050,000,000 Pieces
Production Hrs. Annual 8,568
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $776,118 19,497,949 kWh $0.04
Electricity Demand $315,367 30,309 kW-months/year $10.41
Electricity Fees $84,694 - $ -
Natural Gas $592,966 117,081 MMBtu $5.06
TOTAL ENERGY COSTS $1,769,145
RECOMMENDED SAVINGS* $522,638 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,406
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Water Consumption Primary Product By-product Production Electricity Usage Electricity Demand Natural Gas Personnel Changes Water Consumption Primary Product By-product Production
$ kWh $ kW-months/year $ MMBtu $ $ $ Tgal $ $ $ $
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$528
Cost:
$750
$319 6,448 $209 28 - - - - - - - - - - $319
6,448
kWh
$209
28
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,829
Cost:
$20,012
$10,755 237,691 $3,074 308 - - - - - - - - - - $10,755
237,691
kWh
$3,074
308
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
-
-
$
-
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$141,064
Cost:
$100,000
- - - - $141,064 29,988 - - - - - - - - -
-
kWh
-
-
kW-months/year
$141,064
29,988
MMBtu
-
-
$
-
-
Tgal
-
-
$
-
-
$
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$2,577
Cost:
$785
$2,577 57,444 - - - - - - - - - - - - $2,577
57,444
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
-
-
$
-
-
$
05: 2.4325 UPGRADE CONVEYORS Savings:
$3,611
Cost:
$10,240
$2,752 61,547 $859 86 - - - - - - - - - - $2,752
61,547
kWh
$859
86
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
-
-
$
-
-
$
06: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$14,269
Cost:
$9,500
$(-768) (-16,999) $(-240) 24 - - $(-300) - $15,577 - - - - - $(-768)
(-16,999)
kWh
$(-240)
24
kW-months/year
-
-
MMBtu
$(-300)
-
$
$15,577
-
Tgal
-
-
$
-
-
$
07: 4.521 CLEAR AND RENT EXISTING SPACE Savings:
$27,050
Cost:
$3,600
- - - - - - - - - - - - $27,050 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
-
-
$
$27,050
-
$
08: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$300,000
Cost:
$80,000
- - - - - - $300,000 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$300,000
-
$
-
-
Tgal
-
-
$
-
-
$
09: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$19,710
Cost:
$46,000
- - - - - - - - - - $25,200 - $(-5,490) - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
$25,200
-
$
$(-5,490)
-
$
TOTAL RECOMMENDED Savings:
$522,638
Cost:
$270,887
$15,635 346,131 $3,902 446 $141,064 29,988 $299,700 - $15,577 - $25,200 - $21,560 - $15,635
346,131
kWh
$3,902
446
kW-months/year
$141,064
29,988
MMBtu
$299,700
-
$
$15,577
-
Tgal
$25,200
-
$
$21,560
-
$
TOTAL IMPLEMENTED Savings:
$16,406
Cost:
$20,797
$13,332 295,135 $3,074 308 - - - - - - - - - - $13,332
295,135
kWh
$3,074
308
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ Tgal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Water Consumption Primary Product By-product Production Electricity Usage Electricity Demand Natural Gas Personnel Changes Water Consumption Primary Product By-product Production