Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Arizona State University |
---|---|
Assessment Year | 1998 |
Principal Product | Steel Hosereels |
NAICS | n/a |
SIC | 3499 - Fabricated Metal Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 90 |
Plant Area (Sq.Ft.) | 20,000 |
Annual Production | 60,000 Pieces |
Production Hrs. Annual | 4,310 |
Location (State) | AZ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $59,182 | 973,329 | kWh | $0.06 |
Electricity Demand | $9,112 | 3,108 | kW-months/year | $2.93 |
Electricity Fees | $5,832 | - | $ | - |
Natural Gas | $51,412 | 9,267 | MMBtu | $5.55 |
TOTAL ENERGY COSTS | $125,538 | |||
RECOMMENDED SAVINGS* | $159,986 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $155,158 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $508 Cost: $220 |
$351 | 7,034 | $157 | 20 | - | - | - | - | - | - | - | - |
$351 7,034 kWh |
$157 20 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $524 Cost: $60 |
$363 | 7,327 | $161 | 23 | - | - | - | - | - | - | - | - |
$363 7,327 kWh |
$161 23 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT |
Savings: $415 Cost: $365 |
$415 | 8,499 | - | - | - | - | - | - | - | - | - | - |
$415 8,499 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,226 Cost: $8,275 |
$1,415 | 29,015 | $811 | 103 | - | - | - | - | - | - | - | - |
$1,415 29,015 kWh |
$811 103 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $83 Cost: $87 |
$45 | 879 | $8 | 1 | - | - | $15 | - | - | - | $15 | - |
$45 879 kWh |
$8 1 kW-months/year |
- - MMBtu |
$15 - $ |
- - $ |
$15 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $368 Cost: $60 |
- | - | - | - | - | - | - | - | $368 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
$368 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $47,175 Cost: $480 |
- | - | - | - | - | - | $47,175 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$47,175 - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.812 APPLY FOR INVESTMENT INCENTIVES |
Savings: $704 Cost: $60 |
- | - | - | - | - | - | - | - | $704 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
$704 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.121 MAINTAIN CLEAN CONDITIONS BEFORE PAINTING |
Savings: $11,008 Cost: $1,480 |
- | - | - | - | $1,008 | 927 | $10,000 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,008 927 MMBtu |
$10,000 - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS |
Savings: $96,975 Cost: $150,000 |
- | - | - | - | - | - | $96,975 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$96,975 - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $159,986 Cost: $161,087 |
$2,589 | 52,754 | $1,137 | 147 | $1,008 | 927 | $154,165 | - | $1,072 | - | $15 | - | $2,589 52,754 kWh |
$1,137 147 kW-months/year |
$1,008 927 MMBtu |
$154,165 - $ |
$1,072 - $ |
$15 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $155,158 Cost: $151,960 |
- | - | - | - | $1,008 | 927 | $154,150 | - | - | - | - | - | - - kWh |
- - kW-months/year |
$1,008 927 MMBtu |
$154,150 - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Ancillary Material Cost |