IAC logo
IAC Assessment: AS0233
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0233
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1998
Principal Product Steel Hosereels
NAICS n/a
SIC 3499 - Fabricated Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 20,000
Annual Production 60,000 Pieces
Production Hrs. Annual 4,310
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $59,182 973,329 kWh $0.06
Electricity Demand $9,112 3,108 kW-months/year $2.93
Electricity Fees $5,832 - $ -
Natural Gas $51,412 9,267 MMBtu $5.55
TOTAL ENERGY COSTS $125,538
RECOMMENDED SAVINGS* $159,986 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $155,158
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$508
Cost:
$220
$351 7,034 $157 20 - - - - - - - - $351
7,034
kWh
$157
20
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$524
Cost:
$60
$363 7,327 $161 23 - - - - - - - - $363
7,327
kWh
$161
23
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$415
Cost:
$365
$415 8,499 - - - - - - - - - - $415
8,499
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,226
Cost:
$8,275
$1,415 29,015 $811 103 - - - - - - - - $1,415
29,015
kWh
$811
103
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$83
Cost:
$87
$45 879 $8 1 - - $15 - - - $15 - $45
879
kWh
$8
1
kW-months/year
-
-
MMBtu
$15
-
$
-
-
$
$15
-
$
06: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$368
Cost:
$60
- - - - - - - - $368 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$368
-
$
-
-
$
07: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$47,175
Cost:
$480
- - - - - - $47,175 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$47,175
-
$
-
-
$
-
-
$
08: 4.8120 APPLY FOR INVESTMENT INCENTIVES Savings:
$704
Cost:
$60
- - - - - - - - $704 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$704
-
$
-
-
$
09: 4.1210 MAINTAIN CLEAN CONDITIONS BEFORE PAINTING Savings:
$11,008
Cost:
$1,480
- - - - $1,008 927 $10,000 - - - - - -
-
kWh
-
-
kW-months/year
$1,008
927
MMBtu
$10,000
-
$
-
-
$
-
-
$
10: 4.5140 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$96,975
Cost:
$150,000
- - - - - - $96,975 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$96,975
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$159,986
Cost:
$161,087
$2,589 52,754 $1,137 147 $1,008 927 $154,165 - $1,072 - $15 - $2,589
52,754
kWh
$1,137
147
kW-months/year
$1,008
927
MMBtu
$154,165
-
$
$1,072
-
$
$15
-
$
TOTAL IMPLEMENTED Savings:
$155,158
Cost:
$151,960
- - - - $1,008 927 $154,150 - - - - - -
-
kWh
-
-
kW-months/year
$1,008
927
MMBtu
$154,150
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost