IAC logo
IAC Assessment: AS0234
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0234
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1998
Principal Product Automated Machinery
NAICS n/a
SIC 3823 - Process Control Instruments
Sales $5,000,000-$10,000,000
# of Employees 22
Plant Area (Sq.Ft.) 40,000
Annual Production 50 Pieces
Production Hrs. Annual 2,725
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $29,036 461,899 kWh $0.06
Electricity Demand $3,771 1,444 kW-months/year $2.61
Electricity Fees $3,103 - $ -
Natural Gas $4,451 680 MMBtu $6.55
TOTAL ENERGY COSTS $40,361
RECOMMENDED SAVINGS* $138,173 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $135,468
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes By-product Production Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes By-product Production
$ kWh $ kW-months/year $ lb $ $ $ $
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$324
Cost:
$525
$324 5,862 - - - - - - - - $324
5,862
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
02: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS Savings:
$1,398
Cost:
$4,425
$1,097 20,223 $301 48 - - - - - - $1,097
20,223
kWh
$301
48
kW-months/year
-
-
lb
-
-
$
-
-
$
03: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$3,384
Cost:
$60
- - - - $3,384 - - - - - -
-
kWh
-
-
kW-months/year
$3,384
-
lb
-
-
$
-
-
$
04: 4.3220 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$132,000
Cost:
$48,000
- - - - - - - - $132,000 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$132,000
-
$
05: 4.8120 APPLY FOR INVESTMENT INCENTIVES Savings:
$900
Cost:
$60
- - - - - - $900 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$900
-
$
-
-
$
06: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$83
Cost:
$100
- - - - - - $83 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$83
-
$
-
-
$
07: 4.4540 MODIFY STARTUP/SHUTDOWN TIMES Savings:
$84
Cost:
$360
$84 15,533 - - - - - - - - $84
15,533
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$138,173
Cost:
$53,530
$1,505 41,618 $301 48 $3,384 - $983 - $132,000 - $1,505
41,618
kWh
$301
48
kW-months/year
$3,384
-
lb
$983
-
$
$132,000
-
$
TOTAL IMPLEMENTED Savings:
$135,468
Cost:
$48,420
$84 15,533 - - $3,384 - - - $132,000 - $84
15,533
kWh
-
-
kW-months/year
$3,384
-
lb
-
-
$
$132,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes By-product Production Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes By-product Production