IAC logo
IAC Assessment: AS0235
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0235
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1998
Principal Product Electrical Wiring Harnesses
NAICS n/a
SIC 3795 - Tanks And Tank Components
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 38,000
Annual Production 80,000 Pieces
Production Hrs. Annual 2,125
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $16,149 294,256 kWh $0.05
Electricity Demand $14,098 1,484 kW-months/year $9.50
Electricity Fees $1,828 - $ -
LPG $8,798 903 MMBtu $9.74
TOTAL ENERGY COSTS $40,873
RECOMMENDED SAVINGS* $54,635 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption By-product Production Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption By-product Production
$ kWh $ kW-months/year $ $ $ $ $ $ $ Tgal $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,242
Cost:
$18,549
$3,213 55,393 $3,029 302 - - - - - - - - - - $3,213
55,393
kWh
$3,029
302
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
Tgal
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$395
Cost:
$253
$102 1,758 $82 8 $187 - - - $24 - - - - - $102
1,758
kWh
$82
8
kW-months/year
$187
-
$
-
-
$
$24
-
$
-
-
Tgal
-
-
$
03: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,571
Cost:
$939
$795 13,775 $776 77 - - - - - - - - - - $795
13,775
kWh
$776
77
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
Tgal
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$300
Cost:
$305
$154 2,638 $34 3 $62 - - - $50 - - - - - $154
2,638
kWh
$34
3
kW-months/year
$62
-
$
-
-
$
$50
-
$
-
-
Tgal
-
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$294
Cost:
$375
$294 4,982 - - - - - - - - - - - - $294
4,982
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
Tgal
-
-
$
06: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$670
Cost:
$60
- - - - - - $670 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$670
-
$
-
-
$
-
-
Tgal
-
-
$
07: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$163
Cost:
$521
- - - - $(-20) - $300 - $(-105) - $(-12) - - - -
-
kWh
-
-
kW-months/year
$(-20)
-
$
$300
-
$
$(-105)
-
$
$(-12)
-
Tgal
-
-
$
08: 4.3220 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$45,000
Cost:
$47,960
- - - - - - - - - - - - $45,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
Tgal
$45,000
-
$
TOTAL RECOMMENDED Savings:
$54,635
Cost:
$68,962
$4,558 78,546 $3,921 390 $229 - $970 - $(-31) - $(-12) - $45,000 - $4,558
78,546
kWh
$3,921
390
kW-months/year
$229
-
$
$970
-
$
$(-31)
-
$
$(-12)
-
Tgal
$45,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $ $ Tgal $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption By-product Production Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption By-product Production