IAC logo
IAC Assessment: AS0236
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0236
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1998
Principal Product Vitamins
NAICS n/a
SIC 2833 - Medicinals And Botanicals
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 100,000
Annual Production 150,000,000 Pieces
Production Hrs. Annual 2,625
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $79,750 920,281 kWh $0.09
Electricity Demand $5,974 3,490 kW-months/year $1.71
Electricity Fees $5,327 - $ -
Natural Gas $8,795 1,350 MMBtu $6.51
TOTAL ENERGY COSTS $99,846
RECOMMENDED SAVINGS* $1,564,897 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost Primary Product Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost Primary Product
$ kWh $ kW-months/year $ gal $ lb $ $ $ $ $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,320
Cost:
$12,169
$4,332 56,565 $988 200 - - - - - - - - - - - - - - $4,332
56,565
kWh
$988
200
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$563
Cost:
$425
$414 5,275 $29 5 - - - - $39 - - - $81 - - - - - $414
5,275
kWh
$29
5
kW-months/year
-
-
gal
-
-
lb
$39
-
$
-
-
$
$81
-
$
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$391
Cost:
$60
$279 3,517 $112 37 - - - - - - - - - - - - - - $279
3,517
kWh
$112
37
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,972
Cost:
$20
$767 9,965 $1,205 223 - - - - - - - - - - - - - - $767
9,965
kWh
$1,205
223
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,954
Cost:
$3,800
$2,233 29,308 $721 133 - - - - - - - - - - - - - - $2,233
29,308
kWh
$721
133
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$266
Cost:
$60
$201 2,638 $65 12 - - - - - - - - - - - - - - $201
2,638
kWh
$65
12
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
07: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$9,433
Cost:
$9,200
$8,601 112,544 $832 154 - - - - - - - - - - - - - - $8,601
112,544
kWh
$832
154
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
08: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$3,018
Cost:
$1,725
$3,018 39,566 - - - - - - - - - - - - - - - - $3,018
39,566
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
09: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$120
Cost:
$60
- - - - $120 - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$120
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
10: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$6,934
Cost:
$1,560
- - - - - - $6,934 - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
gal
$6,934
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
11: 4.522 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE Savings:
$46,400
Cost:
$2,180
- - - - - - - - - - $11,400 - - - $35,000 - - - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
-
-
$
$11,400
-
$
-
-
$
$35,000
-
$
-
-
$
12: 4.112 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL Savings:
$1,487,526
Cost:
$600,000
- - - - - - - - - - - - - - - - $1,487,526 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
$1,487,526
-
$
TOTAL RECOMMENDED Savings:
$1,564,897
Cost:
$631,259
$19,845 259,378 $3,952 764 $120 - $6,934 - $39 - $11,400 - $81 - $35,000 - $1,487,526 - $19,845
259,378
kWh
$3,952
764
kW-months/year
$120
-
gal
$6,934
-
lb
$39
-
$
$11,400
-
$
$81
-
$
$35,000
-
$
$1,487,526
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ lb $ $ $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost Primary Product Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost Primary Product