Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1998
Principal Product Machinery and Subassemblies for Semiconductor Equipment
NAICS n/a
SIC 3559 - Special Industry Machinery, Nec
Sales $50,000,000-$100,000,000
# of Employees 115
Plant Area (Sq.Ft.) 46,000
Annual Production 23,000 Pieces
Production Hrs. Annual 4,896
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $114,151 2,038,980 kWh $0.06
Electricity Demand $10,582 3,784 kW-months/year $2.80
Electricity Fees $9,776 - $ -
TOTAL ENERGY COSTS $134,509
RECOMMENDED SAVINGS* $10,607 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ lb $ $ $ $
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$901
Cost:
$1,875
$901 23,154 - - - - - - - - $901
23,154
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,256
Cost:
$16,930
$4,623 118,406 $2,633 240 - - - - - - $4,623
118,406
kWh
$2,633
240
kW-months/year
-
-
lb
-
-
$
-
-
$
03: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$1,014
Cost:
$60
- - - - $1,014 - - - - - -
-
kWh
-
-
kW-months/year
$1,014
-
lb
-
-
$
-
-
$
04: 4.812 APPLY FOR INVESTMENT INCENTIVES Savings:
$1,436
Cost:
$60
- - - - - - $1,280 - $156 - -
-
kWh
-
-
kW-months/year
-
-
lb
$1,280
-
$
$156
-
$
TOTAL RECOMMENDED Savings:
$10,607
Cost:
$18,925
$5,524 141,560 $2,633 240 $1,014 - $1,280 - $156 - $5,524
141,560
kWh
$2,633
240
kW-months/year
$1,014
-
lb
$1,280
-
$
$156
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes One-time Revenue or Avoided Cost