IAC Assessment: AS0251
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0251
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1999
Principal Product Refuse collection vehicles
NAICS n/a
SIC 3713 - Truck And Bus Bodies
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 125,000
Annual Production 450 Pieces
Production Hrs. Annual 2,295
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $110,877 1,457,210 kWh $0.08
Electricity Demand $7,778 4,548 kW-months/year $1.71
Electricity Fees $8,053 - $ -
Natural Gas $884 56 MMBtu $15.79
TOTAL ENERGY COSTS $131,361
RECOMMENDED SAVINGS* $495,876 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $89,667
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Primary Product Increase in Production Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Primary Product Increase in Production
$ kWh $ kW-months/year $ gal $ lb $ $ $ $ $ $ $ %
01: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$1,716
Cost:
$1,300
$1,716 35,756 - - - - - - - - - - - - - - $1,716
35,756
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
%
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$393
Cost:
$825
$198 4,103 $195 45 - - - - - - - - - - - - $198
4,103
kWh
$195
45
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
%
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$711
Cost:
$3,018
$374 7,913 $337 41 - - - - - - - - - - - - $374
7,913
kWh
$337
41
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
%
04: 3.5111 FILTER AND REUSE HYDRAULIC OIL Savings:
$3,052
Cost:
$1,600
$(-2) (-293) - - $3,384 1,596 - - $(-106) - $(-224) - - - - - $(-2)
(-293)
kWh
-
-
kW-months/year
$3,384
1,596
gal
-
-
lb
$(-106)
-
$
$(-224)
-
$
-
-
$
-
-
%
05: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$6,862
Cost:
$30
- - - - - - $6,862 - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
gal
$6,862
-
lb
-
-
$
-
-
$
-
-
$
-
-
%
06: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$87,240
Cost:
$10,375
- - - - $87,240 - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$87,240
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
%
07: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$270,903
Cost:
$520,000
$(-1,471) (-30,481) $(-1,646) (-200) - - - - $(-100,980) - - - $375,000 - - - $(-1,471)
(-30,481)
kWh
$(-1,646)
(-200)
kW-months/year
-
-
gal
-
-
lb
$(-100,980)
-
$
-
-
$
$375,000
-
$
-
-
%
08: 4.311 SCHEDULE DELIVERIES ACCORDING TO DEMAND Savings:
$124,999
Cost:
$146,360
- - - - - - - - - - - - - - $124,999 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
$124,999
-
%
TOTAL RECOMMENDED Savings:
$495,876
Cost:
$683,508
$815 16,998 $(-1,114) (-114) $90,624 1,596 $6,862 - $(-101,086) - $(-224) - $375,000 - $124,999 - $815
16,998
kWh
$(-1,114)
(-114)
kW-months/year
$90,624
1,596
gal
$6,862
-
lb
$(-101,086)
-
$
$(-224)
-
$
$375,000
-
$
$124,999
-
%
TOTAL IMPLEMENTED Savings:
$89,667
Cost:
$14,693
$2,090 43,669 $337 41 $87,240 - - - - - - - - - - - $2,090
43,669
kWh
$337
41
kW-months/year
$87,240
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ gal $ lb $ $ $ $ $ $ $ %
Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Primary Product Increase in Production Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Primary Product Increase in Production