IAC logo
IAC Assessment: AS0253
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0253
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1999
Principal Product Metal Framing Products
NAICS n/a
SIC 3441 - Fabricated Structural Metal
Sales $10,000,000-$50,000,000
# of Employees 38
Plant Area (Sq.Ft.) 60,000
Annual Production 48,000,000 Pieces
Production Hrs. Annual 6,163
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $62,456 1,012,896 kWh $0.06
Electricity Demand $8,188 3,085 kW-months/year $2.65
Electricity Fees $5,916 - $ -
TOTAL ENERGY COSTS $83,140
RECOMMENDED SAVINGS* $12,199 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,287
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ gal $ lb $ $ $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,900
Cost:
$4,824
$1,550 28,429 $350 56 - - - - - - - - $1,550
28,429
kWh
$350
56
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,416
Cost:
$160
$1,028 18,757 $388 61 - - - - - - - - $1,028
18,757
kWh
$388
61
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
03: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$1,563
Cost:
$1,200
$1,347 24,619 $216 34 - - - - - - - - $1,347
24,619
kWh
$216
34
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$428
Cost:
$225
$428 7,913 - - - - - - - - - - $428
7,913
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
05: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$468
Cost:
$560
$468 8,499 - - - - - - - - - - $468
8,499
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
06: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$1,296
Cost:
$60
- - - - $1,716 - - - - - $(-420) - -
-
kWh
-
-
kW-months/year
$1,716
-
gal
-
-
lb
-
-
$
$(-420)
-
$
07: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$1,611
Cost:
$1,060
- - - - - - $1,611 - - - - - -
-
kWh
-
-
kW-months/year
-
-
gal
$1,611
-
lb
-
-
$
-
-
$
08: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$780
Cost:
$60
- - - - - - - - $780 - - - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
$780
-
$
-
-
$
09: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$2,737
Cost:
$270
- - - - - - - - $2,737 - - - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
$2,737
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$12,199
Cost:
$8,419
$4,821 88,217 $954 151 $1,716 - $1,611 - $3,517 - $(-420) - $4,821
88,217
kWh
$954
151
kW-months/year
$1,716
-
gal
$1,611
-
lb
$3,517
-
$
$(-420)
-
$
TOTAL IMPLEMENTED Savings:
$3,287
Cost:
$1,905
$896 16,412 - - - - $1,611 - $780 - - - $896
16,412
kWh
-
-
kW-months/year
-
-
gal
$1,611
-
lb
$780
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ lb $ $ $ $
Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Administrative Changes Ancillary Material Cost