Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1999
Principal Product Manufactured Homes
NAICS n/a
SIC 2452 - Prefabricated Wood Buildings
Sales $10,000,000-$50,000,000
# of Employees 260
Plant Area (Sq.Ft.) 110,000
Annual Production 1,100 Pieces
Production Hrs. Annual 2,185
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $96,727 1,181,419 kWh $0.08
Electricity Demand $7,922 4,687 kW-months/year $1.69
Electricity Fees $7,554 - $ -
Natural Gas $6,955 918 MMBtu $7.58
TOTAL ENERGY COSTS $124,286
RECOMMENDED SAVINGS* $79,396 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $69,592
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Water Disposal Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ Tgal $ gal $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,761
Cost:
$10,671
$1,596 33,705 $1,165 142 - - - - - - - - $1,596
33,705
kWh
$1,165
142
kW-months/year
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
02: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$3,410
Cost:
$3,840
$3,410 71,512 - - - - - - - - - - $3,410
71,512
kWh
-
-
kW-months/year
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
03: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$2,133
Cost:
$2,400
$1,725 36,342 $408 50 - - - - - - - - $1,725
36,342
kWh
$408
50
kW-months/year
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,330
Cost:
$840
$2,330 48,945 - - - - - - - - - - $2,330
48,945
kWh
-
-
kW-months/year
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,213
Cost:
$3,800
$1,652 34,584 $1,561 190 - - - - - - - - $1,652
34,584
kWh
$1,561
190
kW-months/year
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
06: 3.5131 RECYCLE WHITE WATER Savings:
$14,029
Cost:
$500
- - - - $36 20,400 $9,660 20,400 - - $4,333 - -
-
kWh
-
-
kW-months/year
$36
20,400
Tgal
$9,660
20,400
gal
-
-
lb
$4,333
-
$
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$420
Cost:
$120
- - - - - - - - $420 - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
gal
$420
-
lb
-
-
$
08: 4.7110 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM Savings:
$51,100
Cost:
$13,200
- - - - - - - - - - $51,100 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
gal
-
-
lb
$51,100
-
$
TOTAL RECOMMENDED Savings:
$79,396
Cost:
$35,371
$10,713 225,088 $3,134 382 $36 20,400 $9,660 20,400 $420 - $55,433 - $10,713
225,088
kWh
$3,134
382
kW-months/year
$36
20,400
Tgal
$9,660
20,400
gal
$420
-
lb
$55,433
-
$
TOTAL IMPLEMENTED Savings:
$69,592
Cost:
$16,940
$4,055 85,287 $408 50 $36 20,400 $9,660 20,400 - - $55,433 - $4,055
85,287
kWh
$408
50
kW-months/year
$36
20,400
Tgal
$9,660
20,400
gal
-
-
lb
$55,433
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ gal $ lb $ $
Electricity Usage Electricity Demand Water Disposal Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Water Disposal Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes